11.4.6.2
11.4.7
Thermal overload protection, one time constant, Celsius/Fahrenheit LCPTTR/LFPTTR..97
11.4.7.1
11.4.7.2
11.4.8
11.4.8.1
11.4.8.2
11.4.9
Breaker failure protection, phase segregated activation and output CCRBRF ................ 99
11.4.9.1
11.4.9.2
Checking the phase current operate value,
..........................................................99
11.4.9.3
Checking the residual (earth fault) current operate value
11.4.9.4
11.4.9.5
11.4.9.6
11.4.9.7
11.4.9.8
...............................................................101
11.4.9.9
...................................................................102
11.4.9.10
...............................................102
11.4.9.11
11.4.9.12
Verifying that backup signal is released when STALARM is reset............................. 103
11.4.9.13
behaviour......................................................................... 103
11.4.9.14
behaviour.....................................................................................103
11.4.9.15
11.4.10
11.4.10.1
11.4.10.2
11.4.10.3
11.4.11
11.4.11.1
11.4.11.2
11.4.11.3
11.4.12
11.4.12.1
11.4.12.2
11.4.13
11.4.13.1
11.4.13.2
11.4.14
11.4.14.1
11.4.14.2
11.4.15
11.4.15.1
11.4.15.2
11.4.15.3
11.4.16
11.4.16.1
Table of contents
1MRK 511 403-UEN Rev. L
4
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Содержание REC670
Страница 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Страница 2: ......
Страница 28: ...22 ...
Страница 54: ...48 ...
Страница 60: ...54 ...
Страница 66: ...60 ...
Страница 90: ...84 ...
Страница 212: ...206 ...
Страница 218: ...212 ...
Страница 232: ...226 ...
Страница 240: ...234 ...
Страница 241: ...235 ...