IEC140000143-1-en.vsd
IEC140000143 V1 EN-US
Figure 15:
Stop capturing the IEEE C37.118 synchrophasor data
•
Open the capture file and observe the captured synchrophasor data. In order to get the Phasor
names on top of each column (See figure
), the capture process should start before
connecting the PMU Connection Tester to the PMU, i.e. first start the capturing and then click
Connect
.
Section 9
1MRK 511 403-UEN Rev. L
Establishing connection and verifying the IEEE C37.118/1344 communication
70
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved