8 APPENDIXES
8-73
8.8 FL-net Installation Work Check Sheet
Table 8-17 FL-net Installation Work Check Sheet
FL-net Installation Work Check Sheet
Communication line name:
Area code:
Inspection date:
Inspector Company:
Person in charge:
Check
Entry
column
Setup switch
column
Check that all the connectors are properly locked.
Check that each cable bend radius is not smaller than specified.
Check that the connectors are protected with a jacket or the like.
Check that the wires are properly marked with an identification number (line number).
Check that no cables are positioned beneath heavy items.
Check that no communication cables are bundled with a power cable or the like.
Check that the repeater AUI cable length is 2 m or less and that the transceiver AUI
cable length is 50 m or less.
Check that the coaxial cable (10BASE5) length is 500 m or less.
Check that the coaxial cables are properly grounded with a ground terminal.
Check that the coaxial cable shield and transceiver are insulated.
Check that the a terminal resistor is properly attached to a coaxial cable.
Check that the number of cascaded hubs and repeaters is within the specified limit.
Check that the employed twisted-pair cable is of a straight type.
Ca
bl
e
Check that the employed twisted-pair cable belongs to Category 5 and does not
exceed 100 m in length.
Check that the GND terminals of the devices are properly grounded.
Check that each unit is properly fastened to the base.
Check that the base unit is properly fastened to the control panel.
Check that the AUI cable is properly locked.
Un
it
Check that a door or other item does not apply any undue force to the AUI cable
mount.
Check that the RJ45 connector is properly connected.
Check that the AUI cable connector is locked.
Check that the line number labels are properly attached.
Check that the transceiver is properly installed at a marked position.
Check that the transceiver SQE switch is set in compliance with the device
specifications.
Check that the hub is properly secured.
Check that the HUB/MAU selector switch is properly set for the hub.
Hub, etc.
Check that the specified supply voltage is applied to the hub.
• Whenever a modification or change is made or a check is conducted, be sure to run the above checks and enter their
results.
• In the result columns on the right, enter “
○
” to indicate an “OK” result or “
×
” to indicate an “NG” result. In a
selector switch column (inner), enter a rotary switch number or DIP switch position (ON or OFF).
Содержание FL.NET
Страница 1: ......
Страница 2: ......
Страница 29: ...1 OVERVIEW ...
Страница 33: ...2 FL NET MODULE ...
Страница 42: ...3 FL NET MODULE INSTALLATION ...
Страница 46: ...4 FL NET MODULE WIRING PROCEDURES ...
Страница 53: ...5 USER GUIDE ...
Страница 203: ...5 USER GUIDE 5 151 Sample printout ...
Страница 206: ...6 MAINTENANCE ...
Страница 210: ...7 TROUBLESHOOTING ...
Страница 225: ...8 APPENDIXES ...