
CLUTCH MAIN UNIT (EATON 1402)
CL02–25
13.
INSTALL THE TRANSMISSION MOUNTING BOLTS AND TORQUE
TO THE PROPER SPECIFICATION.
Tightening Torque:
37.5-48.5 N
m{382-494 kgf
cm, 28-35 lbf
ft}
IMPORTANT POINT-SET-UP
1.
ADJUST LINKAGE
(1)
Adjust the clutch linkage until the yoke fingers contact the release
bearing (zero free-play in the cab).
(2)
Loosen the lock nut and turn the push rod counterclockwise until the
release bearing contacts the release lever plate or release lever.
(3)
Fully press the pedal up to 5 times to move the release bearing
slightly closer to the transmission and gain free-play in the cab.
2.
ADJUST THE FREE TRAVEL
(1)
Turn the push rod counterclockwise until the release bearing contacts
the release lever plate or release lever.
(2)
Turn the push rod clockwise about 3 1/3 turns.
(3)
Tighten the lock nut.
SHTS02Z020200055
Stroke
pedal
5 times
SHTS02Z020200056
Master cylinder
Push rod
0
SHTS02Z020200057
Lock nut
3.18
SHTS02Z020200058
Standard:
Clearance between release bearing and
release yoke: 3.18 mm {0.125 in.}
Содержание 600
Страница 5: ...CAB EQUIPMENT CAB INDEX CHASSIS GROUP 3 4 ELECTRICAL EQUIPMENT ELECTRIC WIRE HYBRID SYSTEM ...
Страница 20: ...GENERAL INTRODUCTION CHASSIS GN02 14 SHTS00Z000200015C ...
Страница 325: ...SERVICE BRAKE FULL AIR BRAKE BR02 47 DESCRIPTION EN0680202C100008 F G A B E C D X SHTS068020200031 ...
Страница 344: ...SERVICE BRAKE FULL AIR BRAKE BR02 66 SHTS068020200054 ...
Страница 393: ...ABS ABS HYDRAULIC E VERSION BR03 9 SAPH068010300009 ...
Страница 420: ...ABS ABS FULL AIR BR03 17 SHTS068020300032 ...
Страница 433: ...PARKING BRAKE BOSCH 12 BR07 5 PARKING BRAKE SHTS06Z080700003 ...