Configuring and using the fieldbus node
172/263
7. Deploy
Ø
Perform a Deploy in the Node-RED. For this purpose, select one of the
three options of the selection list
Deploy
in the Node-RED window (top,
right).
ð
The flow will thus be transmitted to the netIOT Edge Gateway, and the
new configuration will be applied in the Edge Gateway.
If the GUI in step 4) could not successfully be started, a message similar to
the following appears:
Figure 113: Error message – Firmware mismatch
That means that the expected firmware and the actually determined
firmware do not match. Check your settings in such a case!
Edge Gateway | NIOT-E-TIB100-GB-RE (Remote)
DOC170501UM04EN | Revision 4 | English | 2018-08 | Released | Public
© Hilscher 2017 – 2018