NEW LEADER
HEADER
25
NL450C
Please Give Part No., Description
& Unit Serial No.
307306-B
Page Rev. A
FIELD TESTING
The following procedure is a guide:
1.
Make sure unit has been properly serviced and is in good operating condition. Field test unit prior to first use,
prior to each spreading season’s use, and following overhaul or repair work, to verify that all components and
systems are functioning properly. See
Field Testing
section.
2.
Fill body with material to be spread.
3.
Drive to location where spreading is to be done.
4.
Check and perform the following to maintain proper PTO driveline working order.
a.
The PTO driveline must be cleaned and lubed every time PTO driveline is attached to tractor.
b.
Make sure PTO shields are in proper working order.
c.
Check for loose, damaged, or missing hardware.
d. Repair and replace parts as needed.
5.
Turn on electric in-cab control system and set program to desired values.
6.
Set spinner speed for material being applied to give spread width desired. See
L5034G4 Spread Pattern
section
in this manual.
7.
Adjust spinner assembly position to give spread pattern desired. See
L5034G4 Spread Pattern
section in this
manual.
8.
Open feedgate to maximum opening.
WARNING
Do not climb on unit. Use a portable ladder to view the feedgate. Be careful in getting
on and off the ladder, especially in wet, icy, snowy or muddy conditions. Clean mud,
snow or ice from steps and footwear.
9.
Fill hydraulic tank and lubricate per
Lubrication & Maintenance Chart
.
10.
Make sure valve on hydraulic reservoir is fully opened. Start tractor engine. Turn electronic in-cab control
system “on”. Engage PTO driveline and allow to run at idle long enough to bring hydraulic oil up to operating
temperature. Spinners should revolve at moderate speed and the conveyor should not move.
11.
Set throttle to full PTO operation speed (1000 RPM) to maintain performance of spreader.
Refer to tractor’s
operators’ manual for proper use of PTO driveline.
WARNING
Drive only at speeds which permit good control of tractor implement combination. Loss of
control could cause injury.
12.
Drive at speeds that allow PTO driveline to turn at 1000 RPM.
OPER. & MAINT
.
FIELD TESTING
Содержание NEW LEADER NL450C
Страница 4: ...INSERT CURRENT NEW LEADER WARRANTY...
Страница 52: ...52 Please Give Part No Description Unit Serial No 307306 B Page Rev A NL450C NEW LEADER NOTES N O T E S...
Страница 90: ...90 NEW LEADER Please Give Part No Description Unit Serial No NL450C 307306 C Page Rev A NOTES PA R T S L I S T...
Страница 100: ...100 NEW LEADER Please Give Part No Description Unit Serial No NL450C HEADER BRAKE LINES PA R T S L I S T...