66
Ground Loops Specifications
#
Group
Test or Verify
Test Methods and
Expected Results
Pass /
Fail
Comments
To control the illumination
intensity, right-click and
change levels.
The test should be done
against a reflecting plate.
Camera is looking towards
the middle of the loop.
Video quality is good.
Smooth video stream with
no noise.
All illumination intensities
work properly.
6
Network
Net client connectivity
Write in the configure
section net client (checked)
for enable add IP number
(1368 is our default) restart
and check in data center the
IP is connected.
Содержание C5
Страница 1: ...C5 Installation and Operation Guide Version 1 2 February 2010 ...
Страница 2: ... Copyright 2009 Hi Tech Solutions Inc ...
Страница 6: ......
Страница 12: ......
Страница 16: ......
Страница 28: ......
Страница 38: ......
Страница 45: ...C5 Installation and Operation Guide Viewing and Changing the C5 Configuration File 43 ...
Страница 46: ......
Страница 52: ......
Страница 56: ...54 Ground Loops Specifications ...
Страница 57: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 55 ...
Страница 58: ...56 Ground Loops Specifications ...
Страница 59: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 57 ...
Страница 60: ...58 Ground Loops Specifications ...
Страница 61: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 59 ...
Страница 64: ......
Страница 66: ......
Страница 70: ......