C5 Installation and Operation Guide
Installation Verification Checklist 65
Appendix D
Installation Verification Checklist
#
Group
Test or Verify
Test Methods and
Expected Results
Pass /
Fail
Comments
1 Power
The power supply is installed
and running.
Visual observation.
Verify that the power LEDs
are ON on the power supply
and inside the camera
housing power board.
The UPS is installed,
powered, and connected.
Unplug the UPS power cord
and verify that C5 is awake.
Optional
Loop Controllers are wired
and powered by the main
power in the cabinet and on
the I/O Board.
Visual observation.
Verify power LEDs are ON
the power supply and inside
the camera housing I/O
board.
All cameras are connected to
the power supply.
Visual observation.
Verify that the camera power
LEDs are on.
All cameras are connected to
the LAN connection inside the
camera.
Visual observation.
Verify that the camera power
LEDs are on.
2
Software
C5 Portal is up.
Operate the C5 portal by
navigating to the web site.
3
Ground Loop
and
Ground Loop
Controllers
Loop Controller
Activate it by driving on the
ground loop.
The ground loop is installed
according to manufacturer
datasheet (number of turns,
dimensions, etc.).
Optional
The ground loop controller
shows activity (LED) when it
is activated.
The ground loop controller is
working in presence mode.
4 I/O
Card
Wires have labels and are
tightened to enclosure at I/O
board.
Function
Click image and check the
two green LEDs on I/O
board lighting per
illumination levels operating.
5 Camera
For
each
camera:
Go to image page in the
Portal main page option.
Camera is on.
Camera is mounted to the
wall or to a pole with correct
bolts.
Содержание C5
Страница 1: ...C5 Installation and Operation Guide Version 1 2 February 2010 ...
Страница 2: ... Copyright 2009 Hi Tech Solutions Inc ...
Страница 6: ......
Страница 12: ......
Страница 16: ......
Страница 28: ......
Страница 38: ......
Страница 45: ...C5 Installation and Operation Guide Viewing and Changing the C5 Configuration File 43 ...
Страница 46: ......
Страница 52: ......
Страница 56: ...54 Ground Loops Specifications ...
Страница 57: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 55 ...
Страница 58: ...56 Ground Loops Specifications ...
Страница 59: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 57 ...
Страница 60: ...58 Ground Loops Specifications ...
Страница 61: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 59 ...
Страница 64: ......
Страница 66: ......
Страница 70: ......