WARNING: To reduce the risk of fire or burns after removing the energy pack:
• Do not disassemble, crush, or puncture the energy pack.
• Do not short external contacts.
• Do not dispose of the energy pack in fire or water.
After power is disconnected, battery voltage might still be present for 1s to 160s.
AVERTISSEMENT: Pour réduire les risques d'incendie ou de brûlures après le retrait du module batterie :
• N'essayez pas de démonter, d'écraser ou de percer le module batterie.
• Ne court-circuitez pas ses contacts externes.
• Ne jetez pas le module batterie dans le feu ou dans l'eau.
Après avoir déconnecté l'alimentation, une tension peut subsister dans la batterie durant 1 à 160 secondes.
CAUTION: Protect the system from power fluctuations and temporary interruptions with a regulating UPS. This device
protects the hardware from damage caused by power surges and voltage spikes and keeps the system in operation
during a power failure.
CAUTION: Do not operate the system for long periods with the access panel open or removed. Operating the system in
this manner results in improper airflow and improper cooling that can lead to thermal damage.
Rack warnings and cautions
WARNING: When all components are removed, the system weighs 22.34 kg (49.25 lb). When all components are
installed, the system can weigh up to 40.60 kg (89.51 lb).
Before configuring your rack solution, be sure to check the rack manufacturer weight limits and specifications. Failure to
do so can result in physical injury or damage to the equipment and the facility.
WARNING: The system is heavy. To reduce the risk of personal injury or damage to the equipment, do the following:
• Observe local occupational health and safety requirements and guidelines for manual material handling.
• Get help to lift and stabilize the product during installation or removal, especially when the product is not fastened
to the rails. The system weighs more than 22.34 kg (49.25 lb), so at least two people must lift the system into the
rack together. An additional person may be required to help align the system if the system is installed higher than
chest level.
• Use caution when installing the system in or removing the system from the rack.
• Adequately stabilized the rack before extending a component outside the rack. Extend only one component at a
time. A rack may become unstable if more than one component is extended.
• Do not stack anything on top of rail-mounted component or use it as a work surface when extended from the rack.
Setup
59
Содержание Apollo 4200 Gen10
Страница 36: ...NVMe rear drive cage fan numbering Component identification 36...
Страница 51: ...Two bay SFF hot plug rear drive cage removal Six bay SFF NVMe drive cage removal Operations 51...
Страница 52: ...Six bay SFF rear drive cage SAS or SATA To replace the component reverse the removal procedure Operations 52...
Страница 134: ...Fan assembly cabling Item Description 1 Fan assembly power cable 2 Fan assembly signal cable Cabling 134...
Страница 135: ...Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable Cabling 135...