Installation Manual
Version 1.1
18
Part Number MAN-000014
BinTrac Breeder Control Startup and Warranty
Validation Checklist
A-Frame Bracket Inspection Checklist
– Reference figures below
☐
☐
Proper C-Channel clearance
–
Figure 1
☐
☐
Bin leg properly lifted off the concrete pad
–
Figure 2
☐
☐
Proper clearance between bin leg and A-Frame Bracket
–
Figure 3
Smart Summing Box and Load Cell Inspection
☐
☐
Drip loops at all connection points (Smart Summing Box and load cells)
☐
☐
Mounted on an interior crossmember to avoid excessive water exposure
☐
☐
Proper High Voltage AC & DC wiring separation
☐
☐
Inspect load cell cables for damage from Smart Summing Box to load cell
BinTrac Breeder Control(s)
– Refer to Operator’s manual for Controller setup & installation scenarios
☐
☐
“Setup” – Reference the manual to verify the controller is correctly set as a Master or
Remote depending on your installation scenario
☐
☐
“b.tyPE” Setup – Load or Unload – depending on your installation scenario
☐
☐
“S.CYCL” Setup – On or Off. Default is off.
☐
☐
“Rated” Setup = 3.000
☐
☐
“L.C.CAP” Setup = Load cell capacity multiplied by the number of legs on the bin
☐
☐
“Incr” Setup = User defined. Default is 1
☐
☐
“Full” Setup – Material capacity of bin
☐
☐
“Zero” Setup – Empty weight of bin
☐
☐
“Year” Setup – Verify
☐
☐
“Month” Setup – Verify
☐
☐
“Date” Setup – Verify
☐
☐
“Hour” Setup – Verify
NOTE: Hour is displayed in 24-hour (military) time & is set to CST by default
☐
☐
“Minute” Setup – Verify
☐
☐
“id” = User defined. Default is 1
Figure 1
Figure 2
Figure 3
Yes No
Yes No
Yes No