![Henny Penny Velocity OXE-100 Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/henny-penny/velocity-oxe-100/velocity-oxe-100_operation-manuals_2124401063.webp)
51
1
18
8.. Press the number buttons to set the temperature.
1
19
9.. Press the right-arrow button. ALARM 1 displays.
2
20
0.. Press the number buttons to set the alarm.
2
21
1.. Press the right-arrow button. LOAD COMP displays.
2
22
2.. Press the number buttons to set the LOAD COMP
(Load Compensation) value.
IIN
NF
FO
O: A setting of 0 disables the Load Compensation
feature.
2
23
3.. Press the +
+ or -- button to set the LOAD COMP REF
(Load Compensation) to SETPT (Setpoint) or
OTHER.
• If OTHER is selected, press the right-arrow button and
continue at step 24. LC REF TEMP displays.
• Otherwise continue at step 26.
2
24
4.. Press the number buttons to set the temperature for
the load compensation calculation to reference.
2
25
5.. Press √
√ Y
YE
ES
S to confirm.
2
26
6.. Press the right-arrow button. FULL HEAT displays.
Full heat is the amount of time the heat is applied full
force (thermostatically) at the start of the cook cycle,
before the control switches over to PC (pulsed control)
heating.
2
27
7.. Press the number buttons to set the time.
2
28
8.. Press √
√ Y
YE
ES
S to confirm.
2
29
9.. Press the right-arrow. PC FACTOR displays.
Содержание Velocity OXE-100
Страница 2: ......
Страница 7: ...Contents v ...
Страница 9: ...Contents vii Figure 10 27 Screen 6 97 Figure 10 28 Screen 7 98 ...
Страница 10: ...Contents viii ...
Страница 20: ...Unpacking and Installation 8 ...
Страница 26: ...Initial Startup 14 ...
Страница 38: ...Oil Maintenance 26 ...
Страница 44: ...Cooking 32 ...
Страница 60: ...Maintenance 48 ...
Страница 115: ...Annual Inspection Checklist Form 103 ...
Страница 116: ...Annual Inspection Checklist Form 104 ...
Страница 117: ...blank page ...