Figure 4.
Calibrated test fixture
Existing pressure gauge
3. Thread the calibrated test gauge fixture into
the existing t-fitting. Seal the threads with pipe
thread sealant.
You may have to slightly adjust
the t-fitting by pulling it toward the front of the
fryer with an adjustable wrench to thread in the
test fixture (figure. 4).
4. Thread the existing pressure gauge into the
test fixture T-fitting. Seal the threads with pipe
thread sealant.
Note! -
During the test procedure, use the
calibrated test gauge to collect measurement
data for the inspection form. Also monitor the
existing pressure gauge from the fryer to make
sure that it is functioning within a similar range
to the gauge of the test fixture. If no function
from the existing gauge, a sticking gauge, or one
that does not indicate zero when no pressure in
the fryer, it will need to be replaced with a new
gauge #16910 after the test. (figure. 4).
Calibrated test gauge
Seal Threads
Seal threads
Existing T-fitting
Test fixture T-fitting
5. Remove the four screws (two on each side of the lid) and
remove the lid cover from the lid (figure. 5).
Figure 5.
Remove 2x screws per side
#140463 Calibrated test fixture kit
Inspection 35
Inspection 38 & 39
Rev A
Содержание PFG-691
Страница 1: ...Henny Penny Pressure Fryer Model PFG 691 TECHNICAL MANUAL...
Страница 2: ......
Страница 52: ...Model 691 2 34 SN FH001JC ABOVE Aug 2004...
Страница 53: ...Model 691 2 35 SN FH001JC ABOVE Aug 2004...
Страница 54: ...Model 691 2 36 SN FH001JC ABOVE Aug 2004...
Страница 55: ...Model 691 2 37 BELOW SN FH001JC March 2004...
Страница 56: ...Model 691 2 38 BELOW SN FH001JC March 2004...
Страница 57: ...Model 691 2 39 BELOW SN FH001JC March 2004...
Страница 58: ...Model 691 2 40 BELOW SN FH001JC March 2004...
Страница 60: ......
Страница 62: ...Model 691 3 2 FIGURE 3 1 FRAME COVER ASSEMBLY Oct 2004...
Страница 68: ...Model 691 3 8 FIGURE 3 6 LID COVER ASSEMBLY March 2007...
Страница 70: ...Model 691 3 10 FIGURE 3 7 DRAIN PAN FILTER ASSEMBLY Aug 2010...
Страница 72: ...Model 691 3 12 FIGURE 3 8A FILTER PUMP ASSEMBLY SN LH028JC BELOW Aug 2010...
Страница 74: ...Model 691 3 14 FIGURE 3 8B FILTER PUMP ASSEMBLY SN LH029JC ABOVE Oct 2004...
Страница 77: ...Model 691 3 17 FIGURE 3 10 GAS BURNER ASSEMBLY May 2005...
Страница 79: ...Model 691 3 19 FIGURE 3 11 GAS PIPING CONTROLS Dec 2009...
Страница 84: ...Model 691 3 24 FIGURE 3 15 DEADWEIGHT SOLENOID ASSY SN AP0802029 ABOVE Aug 2010...
Страница 87: ...Model 691 3 27 FIGURE 3 16B STEAM BOX HOSE ASSEMBLY SN AP0802028 BELOW Aug 2010...
Страница 89: ...Model 691 3 29 FIGURE 3 17 FLUE ASSEMBLY BLOWER SN AP0802028 BELOW Dec 2009...
Страница 93: ...Model 691 3 33 FIGURE 3 18 SOLENOID VALVE ASSEMBLY Sept 2005...
Страница 95: ...Model 691 3 35 FIGURE 3 19 FRYPOT DRAIN PIPING Oct 2008...
Страница 97: ...Model 691 3 37 FIGURE 3 20 LIFT BEAM SHROUDS SN AP0802028 BELOW Aug 2010...
Страница 99: ...Model 691 3 39 FIGURE 3 21 COUNTERWEIGHT PULLEY SYSTEM SN AP0802028 BELOW Aug 2010...
Страница 124: ...Inspection 4 Rev A 1219 US 35 West P O Box 60 Eaton OH 45320 937 456 8400 Fax 937 456 8402 www hennypenny com...
Страница 139: ...Inspection 12 Rev A...
Страница 140: ...Inspection 12 Rev A...
Страница 141: ...Inspection 12 Rev A...
Страница 144: ...Inspection 15 Rev A...
Страница 145: ...Inspection 16 Rev A...
Страница 146: ...Inspection 16 Rev A...
Страница 159: ...Inspection 24 Rev A Figure 2 1...
Страница 160: ...Inspection 24 Rev A Figure 2 2...
Страница 183: ......