Inspection 30
Rev. A
1219 US 35 West P.O. Box 60 Eaton, OH 45320 (937)456-8400 Fax (937)456-8402 www.hennypenny.com
Checking Amp Draw for 380, 400 or 415 volt units
(see Figure 2)
1.
With voltage disconnected from the fryer, attach an amp clamp to wire 1L1 at the upper
heating element (Figure 2).
2.
Re-connect voltage to the fryer and select a product to allow the fryer to call for heat. Once
heating, make a note of the wire being checked and the amp draw from the amp clamp.
Example: Wire 1L1 Amp Reading 12.7
3.
Repeat steps 1 and 2 for wires 1L2 and 1L3 for the upper heater and then for wires 1L1, 1L2
and 1L3 for the lower heater. Remember to note amp draw for each wire.
4.
Compare the noted readings with the “Amps per heater” column in Table 1. that matches the
voltage of the fryer. If all voltage readings are within 10% of this number, the heat circuit is
working properly and passes inspection. If one or several of the wires tested does not match,
troubleshoot to narrow down whether there are issues with incoming voltage, contactor(s),
or heating element assemblies.
Figure 2
380, 400, and 415 volt units
Upper
Lower
Figure 1 -
200, 208, 240 and 480 volt units
Содержание PFG-691
Страница 1: ...Henny Penny Pressure Fryer Model PFG 691 TECHNICAL MANUAL...
Страница 2: ......
Страница 52: ...Model 691 2 34 SN FH001JC ABOVE Aug 2004...
Страница 53: ...Model 691 2 35 SN FH001JC ABOVE Aug 2004...
Страница 54: ...Model 691 2 36 SN FH001JC ABOVE Aug 2004...
Страница 55: ...Model 691 2 37 BELOW SN FH001JC March 2004...
Страница 56: ...Model 691 2 38 BELOW SN FH001JC March 2004...
Страница 57: ...Model 691 2 39 BELOW SN FH001JC March 2004...
Страница 58: ...Model 691 2 40 BELOW SN FH001JC March 2004...
Страница 60: ......
Страница 62: ...Model 691 3 2 FIGURE 3 1 FRAME COVER ASSEMBLY Oct 2004...
Страница 68: ...Model 691 3 8 FIGURE 3 6 LID COVER ASSEMBLY March 2007...
Страница 70: ...Model 691 3 10 FIGURE 3 7 DRAIN PAN FILTER ASSEMBLY Aug 2010...
Страница 72: ...Model 691 3 12 FIGURE 3 8A FILTER PUMP ASSEMBLY SN LH028JC BELOW Aug 2010...
Страница 74: ...Model 691 3 14 FIGURE 3 8B FILTER PUMP ASSEMBLY SN LH029JC ABOVE Oct 2004...
Страница 77: ...Model 691 3 17 FIGURE 3 10 GAS BURNER ASSEMBLY May 2005...
Страница 79: ...Model 691 3 19 FIGURE 3 11 GAS PIPING CONTROLS Dec 2009...
Страница 84: ...Model 691 3 24 FIGURE 3 15 DEADWEIGHT SOLENOID ASSY SN AP0802029 ABOVE Aug 2010...
Страница 87: ...Model 691 3 27 FIGURE 3 16B STEAM BOX HOSE ASSEMBLY SN AP0802028 BELOW Aug 2010...
Страница 89: ...Model 691 3 29 FIGURE 3 17 FLUE ASSEMBLY BLOWER SN AP0802028 BELOW Dec 2009...
Страница 93: ...Model 691 3 33 FIGURE 3 18 SOLENOID VALVE ASSEMBLY Sept 2005...
Страница 95: ...Model 691 3 35 FIGURE 3 19 FRYPOT DRAIN PIPING Oct 2008...
Страница 97: ...Model 691 3 37 FIGURE 3 20 LIFT BEAM SHROUDS SN AP0802028 BELOW Aug 2010...
Страница 99: ...Model 691 3 39 FIGURE 3 21 COUNTERWEIGHT PULLEY SYSTEM SN AP0802028 BELOW Aug 2010...
Страница 124: ...Inspection 4 Rev A 1219 US 35 West P O Box 60 Eaton OH 45320 937 456 8400 Fax 937 456 8402 www hennypenny com...
Страница 139: ...Inspection 12 Rev A...
Страница 140: ...Inspection 12 Rev A...
Страница 141: ...Inspection 12 Rev A...
Страница 144: ...Inspection 15 Rev A...
Страница 145: ...Inspection 16 Rev A...
Страница 146: ...Inspection 16 Rev A...
Страница 159: ...Inspection 24 Rev A Figure 2 1...
Страница 160: ...Inspection 24 Rev A Figure 2 2...
Страница 183: ......