![Henny Penny PFG-691 Скачать руководство пользователя страница 167](http://html1.mh-extra.com/html/henny-penny/pfg-691/pfg-691_technical-manual_2124398167.webp)
Inspection 29
Inspection 40 & 41
Rev. A
1219 US 35 West P.O. Box 60 Eaton, OH 45320 (937)456-8400 Fax (937)456-8402 www.hennypenny.com
A
Suction Side of Pump.
Disconnect dairy union
here.
B
Drain Valve
C
Pump connection point
to motor
Test Procedure for plumbing leaks
during cooking
1.
Before test, disconnect the dairy
unit where the drain pan connects
to the oil return line. Caution! This
connection could be hot and require
PPE to remove.
2.
While the fryer is pressurized to
12psi, inspect both the drain valve
and the dairy union connection for
leakage.
3.
If there is significant leakage (more
that just a drop every now and then)
detected from the drain valve, then
it will need to be replaced.
4.
If there is significant leaking (more
that just a drop every now and then)
detected from the oil return line,
then the check valve shown in figure
1 will need to be replaced.
Figure 2.
Left side view of
fryer shown with
the left side panel
removed
A
B
C
Содержание PFG-691
Страница 1: ...Henny Penny Pressure Fryer Model PFG 691 TECHNICAL MANUAL...
Страница 2: ......
Страница 52: ...Model 691 2 34 SN FH001JC ABOVE Aug 2004...
Страница 53: ...Model 691 2 35 SN FH001JC ABOVE Aug 2004...
Страница 54: ...Model 691 2 36 SN FH001JC ABOVE Aug 2004...
Страница 55: ...Model 691 2 37 BELOW SN FH001JC March 2004...
Страница 56: ...Model 691 2 38 BELOW SN FH001JC March 2004...
Страница 57: ...Model 691 2 39 BELOW SN FH001JC March 2004...
Страница 58: ...Model 691 2 40 BELOW SN FH001JC March 2004...
Страница 60: ......
Страница 62: ...Model 691 3 2 FIGURE 3 1 FRAME COVER ASSEMBLY Oct 2004...
Страница 68: ...Model 691 3 8 FIGURE 3 6 LID COVER ASSEMBLY March 2007...
Страница 70: ...Model 691 3 10 FIGURE 3 7 DRAIN PAN FILTER ASSEMBLY Aug 2010...
Страница 72: ...Model 691 3 12 FIGURE 3 8A FILTER PUMP ASSEMBLY SN LH028JC BELOW Aug 2010...
Страница 74: ...Model 691 3 14 FIGURE 3 8B FILTER PUMP ASSEMBLY SN LH029JC ABOVE Oct 2004...
Страница 77: ...Model 691 3 17 FIGURE 3 10 GAS BURNER ASSEMBLY May 2005...
Страница 79: ...Model 691 3 19 FIGURE 3 11 GAS PIPING CONTROLS Dec 2009...
Страница 84: ...Model 691 3 24 FIGURE 3 15 DEADWEIGHT SOLENOID ASSY SN AP0802029 ABOVE Aug 2010...
Страница 87: ...Model 691 3 27 FIGURE 3 16B STEAM BOX HOSE ASSEMBLY SN AP0802028 BELOW Aug 2010...
Страница 89: ...Model 691 3 29 FIGURE 3 17 FLUE ASSEMBLY BLOWER SN AP0802028 BELOW Dec 2009...
Страница 93: ...Model 691 3 33 FIGURE 3 18 SOLENOID VALVE ASSEMBLY Sept 2005...
Страница 95: ...Model 691 3 35 FIGURE 3 19 FRYPOT DRAIN PIPING Oct 2008...
Страница 97: ...Model 691 3 37 FIGURE 3 20 LIFT BEAM SHROUDS SN AP0802028 BELOW Aug 2010...
Страница 99: ...Model 691 3 39 FIGURE 3 21 COUNTERWEIGHT PULLEY SYSTEM SN AP0802028 BELOW Aug 2010...
Страница 124: ...Inspection 4 Rev A 1219 US 35 West P O Box 60 Eaton OH 45320 937 456 8400 Fax 937 456 8402 www hennypenny com...
Страница 139: ...Inspection 12 Rev A...
Страница 140: ...Inspection 12 Rev A...
Страница 141: ...Inspection 12 Rev A...
Страница 144: ...Inspection 15 Rev A...
Страница 145: ...Inspection 16 Rev A...
Страница 146: ...Inspection 16 Rev A...
Страница 159: ...Inspection 24 Rev A Figure 2 1...
Страница 160: ...Inspection 24 Rev A Figure 2 2...
Страница 183: ......