16
CYCLE SEQUENCE
Anytime cycle sequence is modified, softener set-up will revert to
manufacturer setting and must be reprogrammed as desired.
Cycle Sequence instructions allows the operator to set the order of the
cycle. The Softener System Setup allows the operator to set how long
the cycles will last. The operator may choose up to 9 cycles in any order.
END must be used as the last cycle option. The SOFTENING cycle
should only be used in brine prefill applications to allow salt to dissolve.
Cycle Options
BACKWASH
FILL
RINSE
SOFTENING
END
The following is an example of how to set a valve so that when regeneration is initiated, BACKWASH occurs first, REGENERANT DRAW DN
occurs second, RINSE occurs third, and FILL occurs fourth.
REGENERANT
DRAW-DN
STEP 1CS –
Press NEXT and
simultaneously until TYPE appears on screen and release. Then press
NEXT and
simultaneously again for 3 seconds and release. If screen in step 2CS does not appear in 5
seconds the lock on the valve is activated.
STEP 2CS
–
Valve Type.
Use the
or
to select from 1.0", 1.25", 1.50", 2.0L", 2.0" valve.
H151 is a 1.5” valve. Press NEXT to go to Step 3CS.
STEP 3CS
– Use the
or
to select one of the following:
• OFF; or
• Twin Alternating – Select Alt A or Alt B – See instructions in Step 4CS.
• System Board - Allows Demand Recall Programming – See instructions in Step 9CS.
• No Hard Water Bypass During Regeneration– See instructions in Step 6CS.
• Reclaim Enabled - Allows control to operate in Reclamation Mode – See instructions in Step 8CS.
• Separate Source Enabled - Allows control to have a separate water source during the regeneration
cycle– See instructions in Step 7CS
• Factory Setting is OFF -
Press NEXT to go to Step 8CS.
STEP 1CS
STEP 2CS
1.5
SET
STEP 3CS
OFF
ALTERNATOR SYSTEM
SET
VALVE TYPE
ALT A
ALTERNATOR SYSTEM
SET
STEP 4CS
STEP 5CS
REFRESH RINSE
SET
TYPE
MIN
STEP 4CS –Twin Alternating System –
Allows automatic alternation between two
units to provide softened water 24 hours a day.
Use
or
buttons to select ALT A or ALT B
Select ALT A for the control valve that has the two-pin connector labeled MAV
connected to the alternator valve.
Select ALT B for the control valve that will be connected via three-prong connector
labeled COMM CABLE. Must use 3-wire interconnect cable. Press NEXT to go to Step
5CS.
For Alternating System, change programming:
• Set softener, with volume capacity in GALLONS and select
Regeneration Time Option “IMMEDIATE” or "DELAYED" and select DAYS BE-
TWEEN REGEN as desired.
• For complete programming, see Twin Alternating MAV manual.
STEP 5CS – Select Twin Alternating Option.
Use
or
buttons to select
• Standard - Standard Alternating Function
• Refresh Rinse - Alternates every 6am & 6pm and runs programmable number of gal-
lons to service. Press NEXT to set number of gallons.
• Delayed Rinse and Fill- See below
• Factory Setting is Standard Alternating Function
This option delays the last two cycles of regeneration (only "Rinse" and "Fill"). This
feature splits the regeneration into two portions. The first portion of the regeneration
will start immediately and all programmed cycles before the "Rinse" and "Fill" cycles
will be performed. After all programmed cycles before "Rinse" and "Fill" are completed
the control valve will drive to the service position (displaying "Delayed Rinse + Fill
Pending"). When the volume of the on-line unit is depleted to 10% of its programmed
capacity, the control valve will be triggered to finish the second portion of the regenera-
tion and complete the "Rinse" and "Fill" cycles and return to Service and be placed into
Standby mode, and wait to come on-line for service. Press NEXT to go to Step 10CS.
➔
➔
➔
➔
➔