3
JOB SPECIFICATION SHEET
MODEL NO. __________________________________________________________________________________________
*WATER TEST AT TIME OF INSTALLATION
_______ Hardness CaCo
3
(gpg)
______ Other______________________
_______ Iron (ppm)
______ Other______________________
_______ pH
______ Other______________________
OPTIONAL RELAY SETTINGS
_______ Off
______ Reclamation mode enabled
______ No Hard By-pass enabled
______ Alternator system enabled
______ Demand Recall
Relay 1
_______ On Time
_______Start Time, Minutes into Regeneration
_______Run Time
_______ On Gallons
Pulse per _______ Gallons
_______ Length Relay Closed
_______ On Regen Gallons
(Relay activated on flow through meter during regeneration and in service)
Pulse per _______ Gallons
_______ Time Relay Closed
_______
On Service Alarm
_______ Gallons
_______ Time
*SIZING INFORMATION
All Water is Softened Except:
_______ Hosebibs _______ Kitchen Cold _______ Toilets _______ All Cold
_______ Other ________________________________________________________________________________________
*INSTALLATION DATE ________________________________________________________________________________
*SERIAL NUMBER ___________________________________________________________________________________
NOTES _____________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Relay 2
_______ On Time
_______Start Time, Minutes into Regeneration
_______Run Time
_______ On Gallons
Pulse per _______ Gallons
_______ Length Relay Closed
_______ On Regen Gallons
(Relay activated on flow through meter during regeneration and in service)
Pulse per _______ Gallons
_______ Time Relay Closed
_______
On Service Alarm
_______ Gallons
_______ Time
_______
Error