Eradicator Gen II O
3
Manual Supplement
Install & Service Guide
18
Copyright ©2021 Aqua Systems, All Rights Reserved • 404 Moravian Valley Road, Waunakee, WI 53597
Gen II O
3
with Ozone
All Periodic Maintenance (PM) that is performed on Eradicator AIF systems annually should be done
in addition to the following procedures when applied with ozone:
1. Inspect all materials that are directly exposed to
ozone. This will include tygon tubing, brine elbow, and
check valve, as well as internal valve parts. Replace any
materials that have formed a brittle, cracked condition.
2. Check all wiring connections on the ozone
components.
3. Swap or Clean the CD tube. (see this page and next)
4. Perform the Periodic Maintenance items for
non O3 Eradicator filters.
4. Perform a test for draw and ozone production after
all PM service has been completed. (see page 15
or page 21)
Periodic Maintenance
Special Considerations in Annual PM with Eradicator AIF with Ozone
Disconnecting the CD Tube for Cleaning
Check Ozone
Here
After all PM maintenance is complete, check
for ozone production with AQ x Relay activated
in Regen DN.
+
+
PILOT
GND
GND
N.C.
N.O.
WARNING
!
ELECTRICAL
HAZARD
DISCONNECT POWER
BEFORE SERVICING
OZOTECH
1. Uplug the power supply before performing this
service.
2.
With the front cover removed, remove the CD cell
from the ozone generator:
a. Disconnect the red spade terminal connector from
the CD cell connection terminal.
b. Cut the CD cell shipping strap holding the cell into
the cell clips, and discard.
c. Disconnect the air inlet and ozone outlet hoses from
the CD cell barb fittings.
d. Pull the CD cell straight up from the retaining clips.
3.
Proceed to next page (19) to clean the CD Tube.
Shipping
Strap
Spade
Terminal
Power Supply Plug or Unplug
Transformer from Receptacle
CD
Tube