Eradicator Gen II O
3
Manual Supplement
Install & Service Guide
16
Copyright ©2021 Aqua Systems, All Rights Reserved • 404 Moravian Valley Road, Waunakee, WI 53597
The EOG II comes pre-assembled, wired, and is ready to connect to the Eradicator control.
See the wire harness connection instructions to the conrol valve on page 9.
The following diagram can be used for future service and trouble shooting if necessary.
Wiring Diagram
Ozone Components Wiring Guide
Gen II O
3
with Ozone
+
+
PILOT
GND
GND
N.C.
N.O.
WARNING
!
ELECTRICAL
HAZARD
DISCONNECT POWER
BEFORE SERVICING
OZOTECH
Harness to
Control Valve
To Power
Terminal on
Control Valve
Circuit Board
To Relay 1
terminal on
Control Valve
Circuit Board
Connect to
Control Valve
Not Shown:
Safety Cover
Alarm
Reset
CD
Cell
Power
Input
Ozone
Outlet
Diagnostic
LED
Terminal
Block
Air Inlet
Green Light Blinking Slowly:
Standby mode; unit is powered, pilot input is OFF.
Green Light Blinking Quickly:
High voltage startup (up to 3 seconds).
Green Light Solid:
High voltage is ON & stable; CD cell producing ozone.
Red Light Solid:
Unstable operation; CD cell may need cleaning.
Green/Red Light Alternating Twice/Second:
HV is ON, but
operating current is low. If persistent, CD cell may need cleaning.
Red Light Flashing:
NO or NC contacts are shorted. Remove short condition.
Orange Light:
1-year timer has expired; clean CD cell, then reset timer by pressing red “alarm reset” button on PCB
once.
LED Diagnostic Functions: