Issued September 2017
On-Route Operation Procedures
Copyright 2017, Heil Environmental
Printed in U.S.A.
108
BEFORE LOADING (CONTINUED)
2. The ejector panel should be:
a. For normal route pickup, about three (3) feet from
the tailgate.
b. If starting with bulk refuse, the ejector panel
should be about six (6) feet from the tailgate.
3. The packing mechanism should be in the START
POSITION with the slide fully IN and the packer
blade fully DOWN. See the figure below.
Figure 59. Packer Blade Starting Position
LOADING REFUSE MANUALLY
Use the following procedures at each stop along the route
to manually load refuse into the unit with the lift arm.
Observe the DANGER and WARNING notices.
DANGER
Your body or clothing can become caught by the blade
while it moves. Serious injury or death may occur if a
person is in or near the hopper when the blade and slide
assembly move. Clear the area near the hopper of all
unnecessary people before you move the blade and slide
assembly and keep all parts of your body away from the
blade.
1. Move the slide and blade into the START position.
See the figure to the left.
a. PUSH the slide and blade levers at the same time
and RELEASE the levers. The levers will self-
center at the end of the commanded position by
way of valve internal hydraulic pressure.
b. The slide will move IN and the blade will move
DOWN.
c. The hopper is now ready to receive refuse.
2. Load the refuse from a container into the hopper and
then move the container to the pick-up location.
Содержание PT 1000
Страница 8: ...NOTES...
Страница 10: ...NOTES 2...
Страница 11: ...Issued September 2017 Introduction Copyright 2017 Heil Environmental Printed in U S A 3 SECTION 1 INTRODUCTION...
Страница 36: ...NOTES 28...
Страница 64: ...NOTES 56...
Страница 68: ...NOTES 60...
Страница 84: ...NOTES 76...
Страница 90: ...NOTES 82...
Страница 150: ...NOTES 142...
Страница 154: ...NOTES 146...
Страница 158: ...NOTES 150...
Страница 162: ...NOTES 154...
Страница 200: ...NOTES 192...