66
SEASON START-UP MAINTENANCE CHECKLIST
To begin season start-up of your Heatmor
TM
Outdoor Furnace, assuming you followed the procedures
outlined in the “End of Season Maintenance Checklist,” follow the instructions below:
1. Remove cap from chimney.
2. Build fire in firebox and bring your furnace up to temperature. (Refer to the “Lighting the Heatmor
TM
for the
first time” section of the Heatmor
TM
Operations and Maintenance Manual.)
3. Once your furnace is up to temperature, you can start all pumps.
CAUTION:
It is recommended to start your pumps AFTER you bring your furnace up to temperature. This
helps ensure your system isn’t air locked and ensure your water is circuating correctly.
4. Your start-up is complete.
CHAPTER 24
Содержание 400-4S
Страница 1: ...Outdoor Furnaces TM SAVE THESE INSTRUCTIONS...
Страница 10: ...5 HEATMOR Stainless Steel Outdoor Furnace Model 400 4S Chapter 1...
Страница 73: ...68...
Страница 88: ...83 PROBLEM CAUSE SOLUTION PROCEDURE...
Страница 92: ...87 Outdoor Furnaces...
Страница 93: ...88 NOTES...
Страница 94: ...89 wiring diagram...
Страница 95: ...90 Revised Manual on 07 11 12...