background image

3

Heatilator  •  HEIR36, HEIR42, HEIR50 Installation Manual  •  2285-980 Rev. G  •  12/14

Installation Standard Work Checklist

Customer:          
Lot/Address:

Model (circle one):   HEIR-36   

HEIR-50

                                   HEIR-42 

Date Installed:          
Location of Fireplace:
Installer:
Dealer/Distributor Phone # 
Serial #:

Comments Communicated to party responsible ____________________ by ______________________on ___________   
 

  

                                                  (Builder / Gen. Contractor/)   (Installer) 

                            (Date) 

Î

 =  Contains updated information.

Hearth & Home Technologies recommends the following:

•  Photographing the installation and copying this checklist for your 

¿

 le.  

•  That this checklist remain visible at all times on the appliance until the installation is complete. 

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in 
this installation manual.

WARNING! Risk of Fire or Explosion! 

Failure to install appliance according to these instructions can lead to a 

¿

 re or explosion.

ATTENTION INSTALLER:

Follow this Standard Work Checklist

Appliance Install Information   

                     YES     IF NO, WHY?

Veri

¿

 ed clearances to combustibles requirements are maintained. (Pg. 12-14)                               ___________________                         

Veri

¿

 ed that the chase is insulated and sealed. (Pg. 14) 

 

              ___________________

Veri

¿

 ed mantel and wall clearance requirements are maintained. (Pg. 44-45)                                ___________________

Veri

¿

 ed hearth extension requirements are maintained. (Pg. 15)                                                    ___________________

Veri

¿

 ed appliance is leveled and secured. (Pg. 30)                                                                         ___________________

Veri

¿

 ed required factory-supplied non-combustible board installed. (Pg. 31)                                            ___________________

Venting/Chimney  Section 7 (Pg. 32-35) 

Veri

¿

 ed venting con

¿

 guration complies to vent diagrams. 

 

              ___________________

Veri

¿

 ed venting installed, locked and sealed/secured in place.  

                                  ___________________

Veri

¿

 ed venting meets clearance to combustible requirements.                                                      ___________________

Veri

¿

 ed wall/ceiling 

¿

 restops are installed (if applicable). 

 

              ___________________

Veri

¿

 ed attic insulation shield is installed (if applicable).  

 

              ___________________

Veri

¿

 ed Exterior wall/Roof 

À

 ashing is installed and sealed. 

 

              ___________________

Veri

¿

 ed termination cap is installed and sealed. 

 

              ___________________

Electrical  Section 8 (Pg. 36-38) 

Veri

¿

 ed unswitched power (110-120 VAC) provided to the appliance. 

 

              ____

_______________

Veri

¿

 ed wall switch wires are properly installed (if applicable). 

 

              ___________________

Gas  Section 9 (Pg. 39-40)

Veri

¿

 ed appliance is using proper fuel type.  

 

              ___________________

If converted, veri

¿

 ed proper fuel conversion kit was used. 

 

              ___________________

Veri

¿

 ed that gas components (

¿

 ttings, pressure taps, etc) are leak free and 

¿

 replace is                                                                               

operating under correct pressures.                                                                                                          ___________________            

Finishing  Section 10 (Pg. 41-46)

Veri

¿

 ed that 

¿

 nish material does not interfere with install/operation of decorative front.                 ___________________

Veri

¿

 ed combustible materials are not

 

installed in non-combustible areas.   

              ___________________

Veri

¿

 ed all clearances meet installation manual requirements. 

 

              ___________________

Veri

¿

 ed mantels/wall projections comply with installation manual requirements.  

              ___________________

Appliance Setup  Section 11 (Pg. 47-55)

Veri

¿

 ed all packaging and protective materials are removed (inside & outside of appliance).                ___________________

Veri

¿

 ed Lava Rock, Mystic Embers, Glowing Embers, and logs installed correctly.                        ___________________

Veri

¿

 ed 

¿

 xed glass assembly installed and secured.                                                                       ___________________

Veri

¿

 ed that a required decorative door option is installed properly.                                                ___________________

Veri

¿

 ed remote control has been programmed and is fully functional.                                             ___________________

Veri

¿

 ed proper air shutter setting for installation type and vent con

¿

 guration.                                 ___________________

Manual bag and all of its contents are removed from inside/under 
     the appliance and given to party responsible for use and operation.                                          ___________________ 

   

                                                                                   

2285-982B 11/13

Comments:

 Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective 

action needed ____________________________________________________________________________________

Содержание HEIR36

Страница 1: ...th other gases unless a certified kit is used Pour demander un exemplaire en fran ais de ce Manuel du propri taire visitez www heatnglo com translations HEIR36H HEIR36T HEIR42H HEIR42T HEIR50H HEIR50T...

Страница 2: ...rances 16 B Chimney Diagram 17 C Approved Pipe 18 D Use of Elbows 18 E Measuring Standards 18 F Vent Diagrams 19 G PVK 80 and PVI SLP Information 25 5 Vent Clearances and Framing A Pipe Clearances to...

Страница 3: ...sulation shield is installed if applicable ___________________ Veri ed Exterior wall Roof ashing is installed and sealed ___________________ Veri ed termination cap is installed and sealed ___________...

Страница 4: ...sence of local codes with National Electric Code ANSI NFPA 70 latest edition or the Canadian Electric Code CSA C22 1 A 110 120 VAC circuit for this product must be pro tected with ground fault circuit...

Страница 5: ...d gas fu eled heating appliance or equipment The sign shall read in print size no less than one half 1 2 in in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB STRUCTIONS Inspection The state or loca...

Страница 6: ...e or substitute components Keep appliance dry B Tools and Supplies Needed Before beginning the installation be sure that the following tools and building supplies are available Tape measure Framing ma...

Страница 7: ...nches Millimeters J 24 610 K 23 1 2 597 L 59 1 4 1505 M 16 406 N 29 5 8 752 O 3 7 8 98 P 2 3 4 70 Q 10 7 8 276 R 16 1 8 410 Location Inches Millimeters A 61 1549 B 35 7 8 911 C 39 7 8 1013 D 31 1 16 7...

Страница 8: ...406 N 32 11 16 830 O 3 7 8 98 P 2 3 4 70 Q 10 7 8 276 R 16 1 8 410 Location Inches Millimeters A 67 1702 B 41 7 8 1064 C 45 7 8 1165 D 36 1 16 916 E 62 5 8 1591 F 40 3 16 1021 G 39 3 16 995 H 59 15 16...

Страница 9: ...AM HEIR36 See Section 10 for facing and finishing detail Figure 3 3 Decorative Front Dimensions HEIR36 40 11 16 IN 1035 mm 35 7 16 IN 900 mm 31 5 8 IN 803 mm 36 3 4 IN 934 mm 3 5 8 IN 92 mm 1 5 16 IN...

Страница 10: ...ions HEIR42 DECORATIVE FRONT DIMENSION DIAGRAM HEIR42 See Section 10 for facing and finishing detail 46 11 16 IN 1186 mm 40 9 16 IN 1030 mm 36 3 4 IN 934 mm 3 9 16 IN 91 mm 1 1 4 IN 32 mm FS 42A 1 1 4...

Страница 11: ...ions HEIR50 DECORATIVE FRONT DIMENSION DIAGRAM HEIR50 See Section 10 for facing and finishing detail 54 11 16 IN 1390 mm 44 7 16 IN 1129 mm 40 5 8 IN 1032 mm 45 11 16 IN 1161 mm 3 9 16 IN 91 mm 1 1 4...

Страница 12: ...lustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY Illustrations diagrams are not drawn to scale Actual installation may vary due to individual design preference Figure 3 6 App...

Страница 13: ...LES IN HATCHED AREA 1 2 IN BUILDING MATERIAL MAY BE COMBUSTIBLE FACTORY SUPPLIED 1 2 IN NON COMBUSTIBLE BOARD PIPE IS FOR VISUAL REFERENCE ONLY 1 IN COMBUSTIBLES NOT ALLOWED 39 IN 2 X 4 FRAMING MATERI...

Страница 14: ...Risk of Fire Maintain specified air space clearances to appliance and vent pipe Insulation and other materials must be secured to prevent accidental contact The chase must be properly blocked to prev...

Страница 15: ...appliance must be raised by the equivalent height to ensure that the hearth extension does not interfere with the installation of the glass assembly required for fireplace operation See Figure 3 10 Fi...

Страница 16: ...n or other materials Failure to keep insulation or other materials away from vent pipe may cause overheating and fire WARNING Figure 4 2 Staggered Termination Caps Gas Wood or Fuel Oil Termination Cap...

Страница 17: ...ly dwellings and serves both dwellings V VENT TERMINAL AREA WHERE TERMINAL IS NOT PERMITTED N 6 inches non vinyl sidewalls 12 inches vinyl sidewalls O 18 inches clearance below an unventilated ventila...

Страница 18: ...th of straight pipe is allowed between two 45 elbows See Figure 4 4 Figure 4 5 shows the vertical and horizontal offsets for DVP elbows Figure 4 4 HORIZONTAL VERTICAL RUN RISE E F F E C T I V E L E N...

Страница 19: ...gree or 45 degree elbow Horizontal termination cap should have a 1 4 inch downward slant to allow any moisture in cap to be released H1 V1 1 Top Vent Horizontal Termination Figure 4 6 One Elbow Note F...

Страница 20: ...P models require a minimum of 36 inches of vertical venting before attaching any elbow to the appliance for the venting configuration in Figure 7 4 DO NOT attach elbow directly to the appliance HEIR36...

Страница 21: ...ft 610 mm H2 Max 2 X V2 4 ft 1 2 m 4 ft 1 2 m H2 Max 2 X V2 5 ft 1 5 m 9 ft 2 7 m H2 Max 2 X V2 6 ft 1 8 m 12 ft 3 7 m H2 Max 2 X V2 7 ft 2 1 m 14 ft 4 3 m H2 Max 2 X V2 10 ft 3 0 m 20 ft 6 1 m H2 Ma...

Страница 22: ...Vent Vertical Termination No Elbow V1 50 ft Max 15 2 m V1 2 ft Min 610 mm NOTE Flue Restrictor ships in manual bag assembly Note Flue restrictor is permit ted ONLY on 30 ft minimum vertical runs with...

Страница 23: ...H1 V2 2 ft 610 mm 1 ft 305 mm 3 ft 914 mm 3 ft 914 mm 4 ft 1 2 m 4 ft 1 2 m 5 ft 1 5 m 9 ft 2 7 m 6 ft 1 8 m 12 ft 3 7 m V1 V2 H1 50 ft 15 2 m Max No specific restrictions on this value EXCEPT V1 V2...

Страница 24: ...0 NG LP V1 H1 H2 V2 Ht Max 2 ft 610 mm 7 in 178 mm 3 ft 914 mm 2 ft 610 mm 4 ft 1 2 m 4 ft 1 2 m 5 ft 1 5 m 8 ft 2 4 m 6 ft 1 8 m 12 ft 3 7 m 7 ft 2 1 m 14 ft 4 3 m 10 ft 3 0 m 20 ft 6 1 m H1 and H2 h...

Страница 25: ...Table 4 1 below for approved Power Venting options for HEIR models PVK 80 PVI SLP HEIR36 APPROVED APPROVED HEIR42 APPROVED APPROVED HEIR50 APPROVED APPROVED PVK 80 Exhaust Control Lever PVI SLP Baffl...

Страница 26: ...or information for regarding the instal lation of a horizontal termination cap Note Heat shields MUST overlap by a minimum of 1 1 2 in 38 mm DVP heat shield designed to be used on a wall 4 in to 7 1 4...

Страница 27: ...om the pipe to prevent overheating Figure 5 3 Installing Ceiling Firestop Figure 5 4 Installing the Attic Shield INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM CEILING FI...

Страница 28: ...orts on the left and right sides of the appliance See Figure 5 6 Remove the knockouts from the appliance with a tin snips Center the duct collar around the exposed hole and attach it to the appliance...

Страница 29: ...g location of the seal cap and heat shields Section 6 splatter guard and finishing templates Section 10 and the logs and Lava Rock Section 11 2 Remove seal cap from top of appliance by removing one sc...

Страница 30: ...ecure the appliance to the framing members See Figure 6 3 and Figure 6 5 for location of nailing tabs in shipping position Bend out side nailing tabs 90 degrees See Figure 6 4 Place the appliance into...

Страница 31: ...shipped fastened to the top surround Remove finishing templates prior to installing non combustible board Remove non combustible facing pieces from back of appliance See Figure 6 6 Install non combus...

Страница 32: ...or 90 and 45 elbows that are changing the vent direction from horizontal to vertical one screw minimum should be put in the outer flue at the horizontal elbow joint to prevent the elbow from rotating...

Страница 33: ...ted every 8 ft 2 44 m after the maximum allowed 25 ft 7 62 m of unsupported rise Vertical runs originating off the rear of the appliance or after any elbow must be supported every 8 ft 2 44 m Horizont...

Страница 34: ...S MIN H MIN MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING NOTICE Failure to properly caulk the roof flashing and pipe seams may permit entry of water Caulk the gap between the roof flashing and...

Страница 35: ...ection of the termination cap MUST be used when connecting vent 1 1 2 38 mm minimum overlap of flue telescoping section is required Failure to maintain overlap may cause overheating and fire Vent term...

Страница 36: ...e same wall box 8 8 Electrical Information Junction Box Installation The electrical junction box can be accessed three ways during installation 1 Through the access plate Remove two screws to release...

Страница 37: ...eless controls be used for their features and functionality with the IntelliFireTM Plus ignition sys tem Figure 8 2 Junction Box Detail Electrical Service and Repair WARNING Risk of Shock Label all wi...

Страница 38: ...n box to 110 120 VAC for proper operation of the appliance WARNING Risk of Shock or Explosion DO NOT wire IPI controlled appliance junction box to a switched circuit Incorrect wiring will override IPI...

Страница 39: ...open flame Fittings and connections could have loos ened during shipping and handling WARNING Risk of Fire DO NOT change valve settings This valve has been preset at the factory WARNING Risk of Fire o...

Страница 40: ...shutter is pre set at the factory for minimum vertical maximum horizontal vent run for this appliance 2 ft vertical and 7 in horizontal Factory Pre Set Air Shutter Settings To adjust air shutter Loos...

Страница 41: ...verhang into the glass opening Observe all clearances when applying combustible materials WARNING Risk of Fire DO NOT apply combustible materials beyond the minimum clearances Comply with all minimum...

Страница 42: ...inch thick The required decorative front will overlap finish materials less than one inch thick Refer to section 10 D for more information Remove template by removing the the two top screws and two sc...

Страница 43: ...43 Heatilator HEIR36 HEIR42 HEIR50 Installation Manual 2285 980 Rev G 12 14 Figure 10 5 Finishing Template Bends...

Страница 44: ...ION 10 D FOR REQUIRED CLEARANCES 7 IN MIN FIREPLACE OPENING COMBUSTIBLE OR NON COMBUSTIBLE WALL 14 IN MIN COMBUSTIBLE COLUMN 4 IN MAX 1 2 IN BUILDING MATERIAL FACTORY SUPPLIED NON COMBUSTIBLE BOARD NO...

Страница 45: ...Combustible Mantel Allowance HEIR50 1 51 3 6 12 9 54 57 60 63 FIREPLACE OPENING 1 2 IN NON COMBUSTIBLE MATERIAL HEIR36 HEIR42 MAX MIN Measurement from fireplace opening to bottom of appliance 35 3 16...

Страница 46: ...USTIBLE MATERIAL C ARCH Figure 10 13 Inside Fit Decorative Fronts The decorative fronts approved for use with this appli ance have been designed to be installed by two methods Overlap Fit or Inside Fi...

Страница 47: ...etainer rail NOTICE Protect and prevent the hearth from damage by covering it with a drop cloth CAUTION Risk of Injury DO NOT put fingers under glass frame Fingers may get pinched by glass frame durin...

Страница 48: ...glass clip See Fig ure 11 6 GRASP FRAME BY LIP THAT GRASP FRAME BY LIP THAT PROJECTS FROM GLASS DO NOT PROJECTS FROM GLASS DO NOT INSERT FINGERS UNDER RAIL INSERT FINGERS UNDER RAIL RAIL RAIL LIP LIP...

Страница 49: ...l DO NOT place embers directly over burner ports Replace ember material annually Improperly placed embers interfere with proper burner operation Ember material is shipped with this gas appliance To pl...

Страница 50: ...e bottom of Log 2 See Figure 4 Mate slots on the bottom of Log 2 with the left and center grate tines See Figure 5 Slide log forward toward front of appliance until left front of log contacts back of...

Страница 51: ...tom of Log 3 See Figure 6 Place log as shown in Figure 7 Log should be centered on the right side of the burner Notches on log should rest on grate tine and burner pan The back left part of Log 3 shou...

Страница 52: ...LOG 5 FOR LOG 5 FOR LOG 6 FOR LOG 6 Figure 12 Log 5 Placement Figure 13 Log 6 Placement Figure 14 Log Set Installed 4 4 3 3 1 1 2 2 6 6 6 6 5 5 2 2 3 3 5 5 1 1 4 4 1 1 3 3 2 2 5 5 Log 6 2284 706 Loca...

Страница 53: ...acement tabs shown in Figure 1 See Figure 3 Figure 3 Log 2 2285 702 Locate log placement slots on the bottom of Log 2 See Figure 4 Mate slots on the bottom of Log 2 with the left and left center grate...

Страница 54: ...actory Slide bottom of Log 4 toward front of appliance until it contacts back side of Log 2 Rest top of Log 4 in notch on top left corner of Log 1 See Figure 2 and Figure 9 Log 3 2285 703 Place log in...

Страница 55: ...barrier removed Contact your dealer or Hearth Home Technologies if the barrier is not present or help is needed to properly install one For more information refer to the instructions supplied with yo...

Страница 56: ...5 mm 12 in 305 mm 14 in 356 mm 1 in 25 mm 8 in 203 mm 6 in 152 mm 10 in 254 mm 1 1 2 in 38 mm 5 in 127 mm 12 in 305 mm UP DVP HVS Vent Support DVP WS Wall Shield Firestop DVP FS Ceiling Firestop DVP45...

Страница 57: ...mm The heat shield is designed to be used on a wall 4 in to 7 1 4 in 102 mm to 184 mm thick If wall thickness is less than 4 in 102 mm the existing heat shields must be field trimmed If wall thickness...

Страница 58: ...Cap Shield DRC RADIUS 13 7 8 in 352 mm 9 1 2 in 241 mm 14 in 356 mm COOL ADDM Cap Shield 11 5 8 in 295 mm 5 3 4 in 146 mm 7 1 8 in 181 mm 12 1 8 in 308 mm DVP BEK2 DVP HPC Cap Brick Extension 13 7 8 i...

Страница 59: ...WH10 20 ft PV Wire Harness PVI WH20 40 ft PV Wire Harness PVI WH40 60 ft PV Wire Harness PVI WH60 80 ft PV Wire Harness PVI WH80 100 ft PV Wire Harness PVI WH100 PVI SLP Power Vent Inline SLP LPC SLP...

Страница 60: ...ilator com Please contact your Heatilator dealer with any questions or concerns For the location of your nearest Heatilator dealer please visit www heatilator com B Accessories Install approved access...

Отзывы: