
37
Heat & Glo • 6000CF-OAK-IPI • 2092-900 Rev.
I
• 1/06
STEP 4.
LOG #3 (SRV385-721): Locate the slot in the underside of this log. Place this log so that this slot fits
onto the left metal tab on log #1. Swing the lower end of this log towards the log grate so it touches the grate.
STEP 5.
LOG #4 (SRV385-723): Locate the slot in the underside of this log. Place the log so that this slot fits
onto the right metal tab on log #1. Swing the lower end so that it sits in or above the dent on the top of log #2.
STEP 6.
LOG #5 (SRV385-722): Place this log so that the notch in the underside of this log is positioned onto
the right grate bar, even with the grate leg. Swing the top portion of the log so it will rest on the dent of log #4.
3
3
4
4
5
5
Figure 12.10
Figure 12.11
Figure 12.12
Figure 12.13
Figure 12.14
Figure 12.15