![Heartland GENTRY GABLE VALUE Series Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/heartland/gentry-gable-value-series/gentry-gable-value-series_assembly-manual_2114792051.webp)
49
PARTS REQUIRED:
DOORS
Center doors on mark as shown
(Fig. B).
Remove temporary supports and check to make sure doors open and close properly.
FINISH
Your doors are now installed.
Center 3/8" measurement
on mark.
3/8"
(1 cm)
Fig. B
3" (7,6 cm)
x10
Flush
against wall panels
Fig. A
OO
2
3
Screw hinge boards into wall supports with (8) 3" screws as shown.
Make sure screws go into framing
.
4
Install
OO
fl ush under panels.
Secure to fl oor frame with (2) 3" screws
(Fig. A)
.
Mark center of door opening, as shown.
OO
x1
69” (175,3) Door Stiffener
(4) 3" (7,6 cm)
Screws
into door stud
(2) 3" (7,6 cm) Screws
OO
TEMPORARY SUPPORT
TEMPORARY SUPPORT