background image

16

x40

2" (5,1 cm)

PARTS REQUIRED:

Place a 

48" X 84"

 panel on the wall frame, as shown. 

Locate the panel 1-1/2" above the top plate.  
Use a 2x3 as a gauge block for the 1-1/2" top overhang measurement.  
Use the gauge block to mark the 3/4" side measurement on the wall stud. 
Secure panel with (2) 2" nails in the corners 

(Fig. A).

2

Secure panel with 2" nails spaced 6" apart on edges and 12" apart inside panel. 

Note the panel lip-edge/square edge orientation.

EXAMPLE WALL 

Ensure your wall is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever,  
move the panel side-to-side until you have a 3/4" measurement on the wall stud.  
Secure corner with (2) 2" nails 

(Fig. B)

.

3/4" Gauge 

Block

x1

3/8 x 48 x 84"

(1 x 121,9 x 213,4 cm )

For squareness maintain 3/4" and 1-1/2" 

measurement along panel edge.

BEGIN  HERE

3/4"

(1,9 cm)

6" 

(15,2 cm)

12" 

(30,5 cm)

         2x3" 

TEMP. SPACER

3/4" GAUGE 

BLOCK

GAA

WALL PANEL INSTALLATION HINTS & EXAMPLES

BEGIN

1

 Angle nail to draw panels

 

 tight at seams.

Install all wall panels with the primed side facing up.

2x3

1-1/2"

(3,8 cm)

3/4"

(1,9 cm)

LIP EDGE

SQUARE

EDGE

Do not nail 

in groove.

 3/4"

(1,9 cm)

Fig. A

 3/4" 

(1,9 cm)

2 Nails

1-1/2" (3,8 cm)

Overlap

Fig. B

 3/4" 

(1,9 cm)

1-1/2" (3,8 cm)

Overlap

2 Nails

 Install 2nd panel  

 flush to

 installed panel.

HINTS

Содержание GENTRY GABLE VALUE Series

Страница 1: ...u enjoy building your shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK STOP Flexible schedule No selling just building Bonus incentives available INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live chat with an agent ...

Страница 2: ... This page intentionally left blank ...

Страница 3: ...LDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials t...

Страница 4: ... assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk G...

Страница 5: ...x 10 2 x 365 8 cm 2 x 4 x 12 5 1 x 10 2 x 365 8 cm cut to 2 x 4 x 141 5 1 x 10 2 x 358 1 cm MATERIAL REQUIRED x2 x10 Optional 12 30 5 cm spacing Standard 16 40 6 cm spacing x3 x12 2 x 4 x 12 5 1 x 10 2 x 365 8 cm Treated Lumber cut to 2 x 4 x 141 5 1 x 10 2 x 358 1 cm 3 7 6 cm hot dipped galvanized nails If your shed came with a separate floor kit then please use the instructions supplied with tha...

Страница 6: ... 100 acrylic latex exterior paint CAULK 4 Tubes Use acrylic latex exterior caulk that is paintable 2 coats recommended DRIP EDGE Feet 60 15 ROOFING FELT Sq ft to cover 198 1 GALVANIZED ROOFING NAILS lbs For roofing felt 2 5 1 cm x1 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails NOTE Use a minimum of 5 8 1 6 cm Oriented Strand Board OSB 5 8 x 48 x96 1 6 x 121 9 x 243 8 cm x5 FLOOR PANELS Not...

Страница 7: ... 10 2 x 165 1 cm x14 ADA 19 32 x 3 1 2 x 84 15 16 1 5 x 8 9 x 215 7 cm x2 CQR 2 x 4 x 34 5 1 x 10 2 x 86 4 cm x1 SG 2 x 4 x 18 1 8 5 1 x 10 2 x 46 cm x4 AF 1 x 3 x 5 2 5 x 7 6 x 12 7 cm USED AS A GAUGE BLOCK FOR 3 4 1 9 cm MEASUREMENT x1 GAA AH x2 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 7 cm AHR x1 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm AHL x1 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm 3 4 1 9 cm 19 3...

Страница 8: ...7 2 cm AO x1 2 x 4 x 19 3 4 5 1 x 10 2 x 50 2 cm PYA 19 32 x 3 x 8 1 2 1 5 x 7 6 x 21 6 cm DF x4 19 32 x 3 x 21 1 5 x 7 6 x 53 3 cm BWR x1 19 32 x 3 x 21 1 5 x 7 6 x 53 3 cm BWL x1 x1 1 4 x 23 7 8 x 96 0 6 x 60 6 x 243 8 cm Peg board x1 1 4 x 23 7 8 x 48 0 6 x 60 6 x 121 9 cm Peg board 7 16 x 19 1 2 x 92 1 2 1 1 x 49 5 x 235 cm x1 7 16 x 19 1 2 x 48 1 1 x 49 5 x 121 9 cm x1 7 16 x 11 1 2 x 96 1 1 ...

Страница 9: ...ANEL DOORS PARTS LIST x9 x1 x1 RIGHT DOOR x1 LEFT DOOR x1 x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm 3 8 x 48 x 84 1 x 121 9 x 213 4 cm GABLE PANELS x2 x2 x2 3 8 x 23 9 16 x 48 1 x 59 9 x 121 9 cm 3 8 x 23 9 16 x 48 1 x 59 9 x 121 9 cm 3 8 x 33 1 2 x 48 1 x 59 9 x 121 9 cm x1 64 Metal Threshold 3 4 1 9 cm x18 Bagged seperately special coating NOTE If you are using a nail gun nails may be used where scr...

Страница 10: ...G METHODS MATERIAL REQUIRED LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 12 30 5 cm 12 30 5 cm 8 Block 4 Block Gravel Gravel Do not exceed 16 4x4 Runner Shingle Shingle Maximum between leveling material locations 48 12 2x4 Treated Lumber 2 Block Level 12 If you are building your shed on a concrete foundation see the following page CONCR...

Страница 11: ...ces end to end and seal seams with caulk Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements 144 365 8 cm 144 365 8 cm 137 348 cm 12 x 11 8 5 8 365 8 x 357 2 cm 12 x 12 365 8 x 365 8 cm 203 5 8 517 2 cm Treated Sill Plate Caulk betw...

Страница 12: ...arts as shown on flat surface Measure and mark BEGIN Your floor frame is now assembled FINISH Flush Flush You will need to cut 2 x 4 x 144 boards down to 141 x2 2 x 4 x 144 5 1 x 10 2 x 365 8 cm Look for Stamp TREATED 32 81 3 cm 48 121 9 cm 64 162 6 cm 80 203 2 cm 141 358 1 cm 96 284 5 cm 112 243 8 cm 128 325 1 cm 144 365 8 cm 1 1 2 3 8 cm 16 40 6 cm 3 7 6 cm Nails ...

Страница 13: ...ment will be approximately 203 5 8 517 2 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame to the 4x4 runners at e...

Страница 14: ...ne panel and squaring frame Ensure that the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 203 5 8 517 2 cm PARTS REQUIRED x1 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm x53 2 5 1 cm FLOOR PANELS Place first 48 x 96 panel with the rough side up painted grid lines side with the 48 edge...

Страница 15: ...de panels Use grid lines to help find framing 5 x2 5 8 x 48 x 96 1 6 x 122 x 243 8 cm x3 5 8 x 47 7 8 x 48 1 6 x 121 9 x 122 cm x185 2 5 1 cm FLOOR PANELS Grid lines up 48 x 96 122 x 243 8 cm 48 x 96 122 x 243 8 cm 47 7 8 x 48 121 9 x 122 cm 47 7 8 x 48 121 9 x 122 cm 47 7 8 x 48 121 9 x 122 cm Flush Flush Flush Flush Flush Flush Flush Flush 3 4 GAUGE BLOCK GAA 3 4 GAUGE BLOCK 3 4 GAUGE BLOCK ...

Страница 16: ... level after installing floor panels Re level if needed The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT LEFT WALL RIGHT WALL FRONT WALL BACK WALL ...

Страница 17: ...d on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header assembly over and nail as shown on the other side Flush Flush Assemble this door header before building any walls Any wall with a door will require this assembly ...

Страница 18: ...posite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm For squareness maintain 3 4 and 1 1 2 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 2x3 TEMP SPACER 3 4 GAUGE BLOCK GAA WALL PANEL INSTALLATION HINTS EX...

Страница 19: ... 78 1 2 5 1 x 10 2 x 199 4 cm AI UM SG UM YFA YFA AI x5 Seam Arrange parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header on flat side Fig A Secure parts with 2 3 nails at each connection Fasten 3 middle parts AL to Pre Assembled Header with 2 3 screws Fig B Secure parts AL to top plates with 2 3 nails at each connection and 4 3 nails at seam 64 162 6 cm ...

Страница 20: ...OO as a temporary brace Secure with with 2 3 screws Secure panel with 2 nails spaced 6 apart on edges 2x4 Flush Flush 4 3 64 162 6 cm Install 48 x 84 window cutout panel flush to installed panel and 1 1 2 from the top plate Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 5 Your 12 eave wall is now assembled Carefully flip the wall over FINISH BEGIN HERE 3 4 1 9 cm 1 1 2...

Страница 21: ...ABLE WALL 3 7 6 cm PARTS REQUIRED x28 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP TP TP SP SP AI x7 1 BEGIN Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams HINT Flush Flush Flush Flush 3 7 6 cm Nails Seam Seam x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP ...

Страница 22: ...2 gable wall FINISH Flush Flush SQUARE EDGE SQUARE EDGE Install 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges...

Страница 23: ... YFA HVC TJ AI x5 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 12 EAVE WALL 3 7 6 cm x24 x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI Seam HINT x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC 3 7 6 cm Nails Seam 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 ...

Страница 24: ...consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 48 x 84 121 9 x 213 4 cm x3 2x3 2x3 3 1 2 8 9 c...

Страница 25: ...23 STANDING YOUR WALLS The following steps show how to stand and secure your walls for a 12 x 12 shed ...

Страница 26: ...2 3 7 6 cm x2 2 5 1 cm x27 PARTS REQUIRED OO x2 69 175 3 Door Stiffener OO D O O R D O O R Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into the floor frame Fig A 2 Your 1st eave wall is now installed FINISH Secure wall bottom plates to floor with 3 nails Fig A 3 Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A 6 15 2 cm 3 7 6 cm Nails Do not nail in groo...

Страница 27: ...spaced 6 apart Angle nails into the floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C Nail panel to side wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your back gable wall is now installed FINISH 1 1 2 3 8 cm x13 2 5 1 cm x2 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Nail 2 nails first 2 5 1...

Страница 28: ...l to side wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 2nd gable wall is now installed FINISH 1 1 2 3 8 cm x13 2 5 1 cm x2 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig C Secure wall top plate with 1 3 screw at the corner at an angle as shown Fig D 3 3 7 6 cm Screw Fig D 3 7 6 cm Nails GABLE WALL INSTALLATION 2 5 ...

Страница 29: ...to both side wall studs with 1 1 2 nails spaced 6 apart Secure wall bottom plates to floor with 3 nails Fig C ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH REMOVE TEMPORARY BRACING 2 5 1 cm x15 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig A Secure top plates with 3 screws at each corner at an a...

Страница 30: ... Ensure all doubler seams are non aligned over seams of wall top plates HVC HVC TJ TJ TP TP SP SP 48 121 9 cm 96 243 8 cm 92 1 2 235 cm 92 1 2 235 cm 48 121 9 cm Nail 24 61cm TYP Fig B 44 1 2 113 cm 44 1 2 113 cm 3 7 6 cm Nails 3 7 6 cm Screws 1 BEGIN Orient parts on top of wall frames Secure from top with 2 3 nails spaced every 24 Fig A Your wall doublers are now installed FINISH 2 Secure from bo...

Страница 31: ...pattern shown FIg A Build 2 rafter assemblies with 1 gusset Fig B Build 5 rafter assemblies with 2 gussets Fig C BEGIN 1 2 3 FINISH Your rafters are now assembled RAFTERS 2 5 1 cm PARTS REQUIRED x144 x12 6 x 24 15 2 x 60 9 cm Flip over rafter assembly and fasten second gusset to other side with 2 nails FIg C Temporary support OO Flush at peak 120 304 8 cm Fit base of rafters in corners of back wal...

Страница 32: ...set Preassembled 1 Gusset Preassembled ALIGN OVER STUDS x24 3 7 6 cm Fig A Align rafters with the wall studs Ensure the measurement between rafters as shown Secure 5 rafters with 2 3 screws angled into doublers Fig A Secure end rafters with 1 3 screw Fig B 1 FINISH Your rafters are now installed BEGIN Fig B Fig B Rafter with ONE GUSSET facing inward Rafter with ONE GUSSET facing inward Flush Flush...

Страница 33: ... right gable panels on AF flush to center panel Secure with 1 1 2 nails Mark the center of the middle panel 2 1 2 6 4 cm 1 3 4 4 4 cm 3 1 2 8 9 cm AF 1 1 2 3 8 cm Nails 1 1 2 3 8 cm Nails GABLE UNITS Install all gable panels with the primed side facing up PARTS REQUIRED x4 2 x 4 x 18 1 8 5 1 x 10 2 x 46 cm AF 1 BEGIN 1 1 2 3 8cm x12 x2 x2 x2 Mark Flush Flush ...

Страница 34: ...de secure gable unit with 2 3 screws toe screwed into each AF at an angle Fig A 2 Lift and set gable unit on wall doubler Measure 1 1 2 3 8 cm down from top plate doubler and mark at each side as shown Hold secure with 1 1 1 2 nail on each side 1 ENSURE GABLE IS CENTERED ON WALL BEFORE NAILING AF NAIL FIRST 1 1 2 3 8 cm DOUBLER 2 9 16 6 5 cm Measure and Mark Fig A DOUBLER 3 7 6 cm Screws 3 Secure ...

Страница 35: ...s a lever move the panel side to side until the top corner is flush at the peak Fig B Adjust the back gable panel for the 1 2 measurement Fig C Secure panel with 2 2 nails in the corners 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x1 2 1 BEGIN Install the 48 x 96 panel first Use the gauge block to ensure the 3 4 measurement on the rafter Fig A and that the panel is flush at the peak Fig B Secure the pan...

Страница 36: ...60 9 cm 24 60 9 cm 2 5 1 cm Nails Rafter Roof Panel Gable Panel Fig C 1 2 1 3 cm Flush Rafter Gable Panel Fig D x1 7 16 x 47 7 8 x 48 1 1 x 121 6 x 121 9 cm Install the 47 7 8 x 48 panel flush to the installed panel and flush at the peak Fig B Secure panel with 2 2 nails in the corners 2 Nails Step 3 2 Nails Step 4 47 7 8 x 48 48 121 9 cm Move to the opposite end Move the panel side to side until ...

Страница 37: ...the 3 4 measurement on the rafter Fig A Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Install the 36 1 2 x 48 roof panel flush to the installed panels Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Flush Flush FINISH Repeat process to install roof panels on the opposite side Your roof panels are now installed 3 4 GAUGE BLOCK GAA Fl...

Страница 38: ...h 2 finishing nails spaced evenly approx 7 1 4 19 1 cm apart BEGIN 1 Repeat above steps to install the back wall gable trim FINISH Flush Flush to top of panel 2 5 1 cm Finishing Nails CQR PARTS REQUIRED GABLE TRIM Fig A Flush Roof Panel 19 32 x 3 1 2 x 84 15 16 1 5 x 8 9 x 215 7 cm x2 CQR 19 32 x 3 1 2 x 84 15 16 1 5 x 8 9 x 215 7 cm x2 CQL x48 2 5 1 cm ...

Страница 39: ...side Your eave trim in now installed Screw through roof panel into VX with 1 1 4 screws approximately 7 1 2 apart as shown Screw through roof panel into AS with 1 1 4 screws approximately 7 1 2 apart as shown Install AS flush to edge of roof panel and flush to installed eave trim VX 1 PARTS REQUIRED EAVE TRIM x2 x2 2 x 6 x 96 5 1 x 15 2 x 243 8 cm VX 2 x 6 x 49 1 2 5 1 x 15 2 x 125 7 cm AS x60 3 7...

Страница 40: ... gable panel Flush to eave soffit 83 1 2 83 1 2 212 1 cm Fig B Install gable end 83 1 2 corner trim under gable panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 83 1 2 corner trim flush to eave soffit and flush along seam of installed corner trim Fig C Secure with 2 finishing nails spaced evenly 2 BEGIN 1 Flush to eave panel 3 8 x 1 3 4 x...

Страница 41: ...Locate collar tie TP on the rafter which is centered over the door Secure TP with 3 3 nails at each end 1 FINISH Your collar tie is now installed BEGIN PARTS REQUIRED COLLAR TIE x6 x1 TP 2 x 4 x 96 5 1 x 10 2 x 243 9 cm 3 7 6 cm ...

Страница 42: ... 1 x 10 2 x 243 8 cm TP x4 2 x 4 x 48 5 1 x 10 2 x 122 cm SP x56 3 7 6 cm Ensure parts TP and SP are aligned perfectly on a flat surface Assemble joist with 3 nails in a staggered pattern Turn assembled joist over and repeat staggered nail pattern 1 BEGIN 2 Glue SP SP TP TP Flush Flush Flush ...

Страница 43: ... 3 screws as shown Pre drilling is suggested for screws Install part AO between front wall studs above window opening at measurement shown below top plate and flush to wall panel Fig A Secure with 3 nails 4 5 6 LEFT WALL BACK WALL BACK WALL FRONT WALL FRONT WALL 3 7 6 cm Nails LEVEL NK PT PYA AO AO x22 3 7 6 cm SEAM 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm x2 AO 2 x 4 x 19 3 4 5 1 x 10 2 x 50 2 cm x1 P...

Страница 44: ...sts on top of joist supports PYA and AO Measure and mark 17 3 8 44 1 cm and 14 2 8 24 4 cm for joist positions at front and back walls Secure joists with 3 screws as shown below 7 BACK WALL FRONT WALL x2 3 7 6 cm x12 17 3 8 44 1 cm 14 3 8 24 4 cm ...

Страница 45: ...RTS REQUIRED BENCH INSTALLATION Assemble 6 shelf supports as shown Install six LR to shelf panels using 3 2 nails Secure one LR to front wall studs with 2 3 nails as shown Secure shelf supports at shown measurement above floor with 3 2 nails 1 Flush LR x36 2 5 1 cm 2 5 1 cm Nails 2 x 3 x19 5 1 x 7 6 x 48 3 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm LR x6 x7 x2 3 7 6 cm ...

Страница 46: ...6 cm Nails x1 7 16 x 19 1 2 x 92 1 2 1 1 x 49 5 x 235 cm x1 7 16 x 19 1 2 x 48 1 1 x 49 5 x 121 9 cm x1 1 4 x 23 7 8 x 96 0 6 x 60 6 x 243 8 cm Peg board x1 1 4 x 23 7 8 x 48 0 6 x 60 6 x 121 9 cm Peg board x1 x1 3 7 6 cm Secure the end of KP with 1 3 nail as shown Secure pegboard with 3 2 nails at each support and 6 2 nails at seams Ensure pegboard is in contact with top of bench 3 2 5 1 cm Nails...

Страница 47: ...2 nails at each wall stud 1 BEGIN 2 x72 2 5 1 cm 2 x 3 x10 5 1 x 7 6 x 25 4 cm AC x7 48 121 9 cm 72 182 9 cm 96 243 8 cm 120 304 8 cm 24 61 cm 144 365 8 cm BE AC x7 FO Flush Flush 2 5 1 cm Nails Flush with top of pegboard 3 7 6 cm Nails 1 x 3 x 96 2 5 x 7 6 x 243 8 cm x1 BE 1 x 3 x 48 2 5 x 7 6 x 121 9 cm x1 FO SEAM SHELF ASSEMBLY x32 ...

Страница 48: ...cm KP x1 1 1 4 3 2 cm Nails 24 61 cm 3 7 6 cm Nails Flush Level WJ KP 3 7 6 cm Screw 1 1 2 3 8 cm Nails 62 157 5 cm 14 35 6 cm x1 7 16 x 11 1 2 x 96 1 1 x 21 2 x 243 8 cm x1 7 16 x 11 1 2 x 48 1 1 x 21 3 x 121 9 cm Secure shelf from oustide of the front wall panel using 1 1 2 nails at measurments shown 5 x1 WJ 1 x 4 x 48 2 5 x 10 2 x 121 9 cm FINISH Your shelf is now installed 2 5 1 cm Nails 2 5 1...

Страница 49: ...ur loft deck is now installed 2 5 1 cm Nails Install loft panels centered over loft joists and loft support board Secure with 2 nails spaced 8 apart x1 x1 22 3 8 x 40 7 8 56 9 x 104 cm 22 3 8 x 96 56 9 x 244 cm x57 2 5 1 cm BEGIN 1 8 20 3 cm ...

Страница 50: ...N 1 Place doors on flat surface 3 8 offset is to top Look for red right and green left on hinge board Install temporary supports OO and GAA as shown OO GAA OFFSET Bottom edges flush 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED OO x1 69 175 3 Door Stiffener TEMPORARY SUPPORT 4 3 7 6 cm Screws 2 1 1 4 3 2 cm Screws ...

Страница 51: ... mark 3 8 1 cm Fig B 3 7 6 cm x10 Flush against wall panels Fig A OO 2 3 Screw hinge boards into wall supports with 8 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor frame with 2 3 screws Fig A Mark center of door opening as shown OO x1 69 175 3 Door Stiffener 4 3 7 6 cm Screws into door stud 2 3 7 6 cm Screws OO TEMPORARY SUPPORT TEMPORARY SUPPOR...

Страница 52: ...TIFFENERS FINISH On right door center OO vertically in door opening Fig A OO will offset the right door 1 in from the door trim Fig C Secure OO with 2 screws through outside trim into OO Fig C OO x2 69 175 3 Door Stiffener OO 2 Screws 5 1 cm x10 2 Screws 5 1 cm 1 2 5 cm Overhang 1 2 5 cm OFFSET Secure OO with 5 2 screws through outside trim into OO Fig B 2 Fig A Fig B Fig C Center OO in door openi...

Страница 53: ...m doors 2 Level AH and AHL AHR as shown and secure from inside with 11 3 4 screws Your door trim is now installed FINISH 3 Fig B Center 1 2 5 cm Screws 2 5 1 cm Finish Nails ZJ Level AH AHL AH AHR Flush Flush Flush 3 4 1 9 cm Screws x40 1 2 5 cm x1 AHR 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm x1 AHL 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 6 cm AH x2 x1 ZJ 19 32...

Страница 54: ...11 3 4 screws 2 Your threshold and decorative door hinges are now installed Install decorative hinges in locations shown and secure with 3 4 screws FINISH 3 4 1 9 cm Screws 64 Metal Threshold 3 4 1 9 cm x11 x4 3 4 1 9 cm x12 Bagged separately special coating Flush to hinge 11 Special Coating Screws ...

Страница 55: ... position with bolt end 3 8 down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws 1 LEFT DOOR Fig A x4 Loop contacts base PRE DRILL 4 HOLES 1 1 4 x 2 1 2 x 69 3 8 with bolt in open position OPEN POSITION Spring is loose 5 16 drill for bolt 1 deep OVER DOOR FRAME OO LOCATE AND PRE DRILL HOLES TO AVOID SPLITTING WOOD DOOR HARDWARE ...

Страница 56: ... with set screw as shown 3 4 Insert handle in hole and secure with 1 1 4 screws FINISH RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through x1 x2 1 1 2 3 8 cm Re drill hole with 3 8 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Measure and mark location of hole on outside of right door Fig A Pre drill hole with 1 4 drill Fig A 35 3 4 90 cm 1 3 4 4 ...

Страница 57: ... 4 gap between AZ BEGIN 1 x4 19 32 x 3 x 8 1 2 5 1 x 7 6 x 21 6 cm DF 19 32 x 3 x 30 1 8 5 1 x 7 6 x 76 5 cm x6 AZ 19 32 x 3 x 18 1 8 1 5 x 7 6 x 53 3 cm x1 BWR 19 32 x 3 x 18 1 8 1 5 x 7 6 x 53 3 cm x1 BWL DF x4 AZ x6 BWR BWL Flush Flush 30 1 8 77 cm 2 1 2 6 3 cm 2 1 2 6 3 cm 2 1 2 6 3 cm 2 1 2 6 3 cm 2 1 2 6 3 cm 1 2 13 mm 8 1 2 21 6 cm Primed side down Primed side down Left Right ...

Страница 58: ...alidate warranty Place window in center of window cutout as shown x1 WINDOW TRIM SHUTTERS 1 5 8 4 1 cm x4 3 4 19 mm x6 2 Place DT resting flat on window top flange Measure mark and center DT with center of window Secure with 2 finish nails Nail into wall frame and studs behind x16 2 5 1 cm Pre assembled shutter x2 Fig A 2 5 1 cm Finishing Nails DT 19 32 x 3 x 28 1 8 1 5 x 7 6 x 71 4 cm x2 DT 1 5 8...

Страница 59: ...th 2 finish nails Nail into wall frame and studs behind Your window and shutters are now installed Fig B Fig C 2 5 1 cm Finishing Nails 3 4 19 mm Screws from inside Flush Flush LEVEL Line up shutter slat flush with end corner of DT as shown Fig B Use a level to ensure shutter is level Secure with 2 finishing nails at locations shown Nail into wall studs Don t nail into metal window frame P U S H I...

Страница 60: ...ls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges 1 Your vents are now installed FINISH Secure with 1 2 screws 16 x 8 x2 1 2 13 mm x12 NOTE Vents not included 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm 1 2 Screws 1 3 cm 1 2 Screws 1 3 cm 14 35 6 cm 6 15 2 cm 5 12 7 cm 7 8 17 8 20 3 cm Caulk Caulk ...

Страница 61: ... Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Install drip edge over roof...

Страница 62: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Страница 63: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 Bend in roof 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Страница 64: ...5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 cm MAX Top of rain slot Cut Off You have finished shingling your roof Proceed to capping the ridge FINISH 9 Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut ...

Страница 65: ...angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush Note You will need about 38 40 cut pieces for 12 x 12 model 30 to 32 Pieces ...

Страница 66: ... between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH 8 Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 2 cm ...

Страница 67: ... 4 x 23 7 8 x 48 A 48002314000 1 GUSSETS Gusset EZ8 OSB 6 X 24 GUSSET 22 5 J 24000600225 12 Center Gable Panel 3 8 NG 23 9 16 X 33 1 2 K 48003308044 2 Front Rear Gable Panel Right 3 8 NG 23 9 16 X 48 RIGHT FRONT GABLE K 48002309100 2 Front Rear Gable Panel Left 3 8 NG 23 9 16 X 48 LEFT FRONT GABLE K 48002309200 2 Corner Trim 3 8 NG 1 3 4 X 83 1 2 K 83080112000 8 Rearwall Panel A Side Panel SIDING ...

Страница 68: ... siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent st...

Отзывы: