27
EAVE WALL INSTALLATION
3" (7,6 cm)
x2
3" (7,6 cm)
x9
2
Place front gable wall on fl oor,
centered between eave walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B)
.
Secure wall to bottom plate fi rst.
BEGIN
1
Nail lower edge of panels to fl oor with 2"
nails spaced 6" apart.
Angle nail to hit fl oor frame
(Fig. C)
.
Secure panels to both side wall studs
with 1-1/2" nails spaced 6" apart.
Secure wall bottom plates to fl oor with 3"
nails
(Fig. C)
.
ENSURE PANEL CORNERS ARE FLUSH.
Your walls are now installed.
FINISH
REMOVE TEMPORARY BRACING
2" (5,1 cm)
x15
1-1/2" (3,8 cm)
x26
2" (5,1 cm)
x4
PARTS REQUIRED
2" (5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
Flush
Flush
6" (15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. A
Secure top plates with 3" screws at
each corner at an angle as shown
(Fig. D)
.
3
3" (7,6 cm)
Screw
Fig. D
2" (5,1 cm) Screw
Fig. B
3" (7,6 cm)
Nails
Nail 2" nails fi rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails