44
2" (5,1 cm)
Nails
PARTS REQUIRED:
Install bench panels centered over shelf supports. Secure with (3) 2" nails at each support.
Secure
HYA
and
KP
with (2) 2" nails at each support and (4) 2" nails at seams.
1
BEGIN
2
x62
2" (5,1 cm)
1 x 4 x 96" (2,5 x 10,2 x 243,8 cm)
KP
x1
HYA
KP
92-1/2"
(235 cm)
48"
(121,9 cm)
Flush
Flush
Flush
3" (7,6 cm)
Nails
x1
7/16 x 19-1/2 x 92-1/2"
(1,1 x 49,5 x 235 cm)
x1
7/16 x 19-1/2 x 48"
(1,1 x 49,5 x 121,9 cm)
x1
1/4 x 23-7/8 x 96"
(0,6 x 60,6 x 243,8 cm) Peg board
x1
1/4 x 23-7/8 x 48"
(0,6 x 60,6 x 121,9 cm) Peg board
x1
x1
3" (7,6 cm)
Secure the end of
KP
with (1) 3" nail as shown
Secure pegboard with (3) 2" nails at each support and (6) 2" nails at seams.
Ensure pegboard is in contact with top of bench.
3
2" (5,1 cm) Nails
HYA
1 x 4 x 44-1/2" (2,5 x 10,2 x 113 cm)
BENCH PANELS / PEG BOARD
FINISH
Your bench and peg board are now installed.