12/19
Model 9035
Page 20 of 26
The following section illustrates the installation of the Shelter Panels. All of the parts necessary to build this
stage are indicated in Figure 26 and assembled as described in Steps 28 thru 32.
FIGURE 26
(CAUTION: At this stage it is likely that some of
the fittings’ setscrews are not fully tightened, and that
some fittings and pipes are not-aligned as intended. Therefore, it is highly recommended that steps be
taken to square-up, re-tighten & thread-lock the setscrews prior to proceeding with the panel
installation.
2X Plain Roof Panels
2X Triangular Panels
(Rear Panel not shown)
1X Right Side
Printed Panel
1X Left Side
Printed Panel
1X Slotted Rear Panel
1X Slotted Rear Panel
2X Plain Side Panels