- Operation instructions
HA20RTJ - HA20RTJ O - HA20RTJ PRO - HA61RTJ O - HA61RTJ PRO
5.6 - L
IFTING
OPERATION
During loading / unloading operation, if it becomes necessary to lift the machine using an
overhead crane, it is important to respect the following :
• Put the machine in stowed position, boom and arm fully retracted and lowered.
• Ensure the platform is empty.
• Rotate the turret and the jib to the configuration in the photos below.
• Lock the turret with turret locking pin.
• Verify that lifting accessories are in good operation and match the technical specifications
listed below. It is important that the lifting devices are attached only to the designated lifting
eyes.
• Each of the chains/slings used for lifting the machine must be adjusted to keep the machine
level and to minimize the risk of damage to the machine.
• Anchorage point for lifting are identified / labeled by the following symbol
.
• ONLY trained and authorized personnel should attempt to lift the machine.
P r o c e d u r e f o r t h e u s e o f s l i n g s
Never lift the machine with slings attached to counterweight.
Number of shackles
Number of slings
Length
Maximum load per sling and shackle
A
4
4
5 m (16 ft 5 in)
3000 daN (6744 lbf)
Содержание HA20RTJ O
Страница 2: ...2 4000388880 E 06 15 GB USA HA20RTJ HA20RTJ O HA20RTJ PRO HA61RTJ O HA61RTJ ...
Страница 54: ...54 4000388880 E 06 15 GB USA HA20RTJ HA20RTJ O HA20RTJ PRO HA61RTJ O HA61RTJ PRO B Familiarization Notes ...
Страница 106: ...106 4000388880 E 06 15 GB USA F Maintenance HA20RTJ HA20RTJ O HA20RTJ PRO HA61RTJ O HA61RTJ PRO Notes ...
Страница 112: ...112 4000388880 E 06 15 GB USA G Other information HA20RTJ HA20RTJ O HA20RTJ PRO HA61RTJ O HA61RTJ PRO Notes ...