Preparing the installation
Several requirements regarding the mounting site and connection technology must be
met for the installation in order to guarantee a safe operation.
Requirements for mounting site
The cPµ1 charging station was developed for indoor as well as outdoor areas. As user,
please note the following requirements for the mounting site and installation to
ensure safe charging later on.
•
Follow all local regulations concerning electrical installation, fire
prevention and accident prevention
•
All regulations to installation a low voltage system according to IEC
60364-1- and IEC 60364-5-52 apply to any times.
•
The mounting surface has to be steady and solid enough to withstand
mechanical pressure.
•
The installation position has to provide a lead big enough for the power
supply
•
Do not install the Wallbox at crowded areas or passage ways. Please
make sure to lay all charging cables in sight and pedestrians or routes
are NOT obstructed in any way.
•
Even though basically the cPµ1 is constructed to operate in an
environment with high temperatures, it is highly recommended to install
the charging station at a place, where it is protected of direct sun
irradiation. This way, overheat of the housing can be prevented. You can
find more information to environmental conditions in section “Technical
specifications” on page 24.
•
The socket and storage devices for the connector should be between 0. 4 m
and 1. 5 m above the ground.