Mechanical installation on wall
At least two persons are required to perform the following instructions. Additionally
these components will be required:
•
An electric drilling machine or a cordless screwdriver (not included in
scope of delivery)
•
A twist drill Ø 6 mm for the respective mounting surface (not included in
scope of delivery)
•
A Torx-screwdriver or
Torx-Bit
TX20 (not included in scope of delivery)
•
4 fastening screws of size 4,0×45/40,5 with matching plastic screw
anchors of size 6×35 mm (included in scope of delivery)
•
if necessary: a level (not included in scope of delivery)
Please proceed as follows:
1.
Take off the front cover of the housing by unscrewing the 4 screws in the
corners. Then carefully unplug the LED Display.
2.
Mark the four drill holes on the wall by using the charging station as
template.
3.
Drill the previously marked spots (Ø 6 mm).
4.
Insert the included screw anchors for the fastening screws.
5.
Position the charging station so the drilled holes of the wall tally with
the ones of the cPµ1.
6.
Now insert the fastening screws and tighten them.
7.
Skip to step 3 of the electrical installation or follow step 8 to complete
the mechanical installation by closing the housing.
8.
Before putting the cover back on, plug the LED-Display back in and then
close the lid over the housing. Use the screws to fasten it back to its
place.
The mechanical installation is now complete.
PLEASE NOTE!
ATTENTION! Please check the measurements on the drilling template
over with a calibrated metering rule BEFORE drilling and marking the
spots for the drilling holes with help of the template.
Instruction Manual
cPµ1
charging station
Version: 1.3.5
15