HARDT
Responsive, Reliable Solutions
CUS-009-0028-11
Page 15 of 21
5.1.2
Chimney Installation
The screws required for mounting the chimneys should
already be located in the vents to which the chimneys will be
connected.
Double Deck Rotisseries
•
Install the upper and lower chimneys onto the rotisserie
as shown in Figure 5-2.
•
Ensure that both chimneys are oriented towards the
front and are parallel to each other.
•
Ensure both chimneys are held in place by the support
bracket.
Single Rotisseries
•
Install only the upper chimney as shown in Figure 5-2.
No support bracket is required.
•
Ensure that the chimney is oriented towards the front.
5.1.3
Machine Room Ventilation Elbow Installation
•
Install the machine room ventilation elbow(s), ensuring
an orientation of 45° towards the fan box the as shown
in Figure 5-2.
Figure 5-2
CHIMNEY(S)
LOWER
SUPPORT BRACKET
(DOUBLE DECK ONLY)
MACHINE ROOM
VENTILATION ELBOW(S)
UPPER