5 - Operation
91
•
In order to shut all nozzles, set the main ON/OFF (3) to OFF
position. This returns the pump output to the tank through the
return system. The diaphragm non-drip valves ensure
instantaneous closing of all nozzles.
•
In order to close one or more sections of the boom, switch the
relevant distribution valve (8) to off position (upwards). The
pressure equalization (DF4, if installed) ensures that the pressure
does not rise in the sections, which remain open.
•
On the sprayer, the suction valve should be turned towards
“suction from main tank” and the pressure valve should be turned
towards “spraying”. Turn the agitation valve to “agitation” if needed.
Содержание RANGER PRO VH
Страница 4: ...1 EU Declaration 4 ...
Страница 10: ...Table of Contents 6 ...
Страница 108: ...5 Operation 104 ...
Страница 111: ...6 Maintenance 107 Boom Lubrication Oiling Plan Lubrication Oiling Plan Trailer Paralift ...
Страница 142: ...6 Maintenance 138 ...
Страница 149: ...8 Technical Specifications 145 Pump Specifications Pump Model 364 5 5 Pump Model 364 7 0 Pump Model 364 10 0 ...
Страница 164: ...Index 160 ...
Страница 166: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...