5 - Operation
90
Operating the Control Unit While Spraying - Spray Box III
The switches of the spray control unit (Spray Box) control the following functions:
1.
Power ON/OFF. Turns the Spray Box power on or off.
2.
Spray pressure regulation. Regulates the main spray pressure.
3.
Main valve ON/OFF. Turns all sections on or off. Lever up is OFF and down is ON.
4.
Optional function (A/OFF/B). If extra equipment is added, it can be controlled from here. Middle position is OFF.
5.
End nozzle (Left/OFF/Right). If end nozzles are fitted, they can be turned on for each side. Middle position is OFF.
6.
Foam marker blob interval. Foam marker equipment is not included from HARDI.
7.
Foam marker (Left/OFF/Right). Foam marker equipment is not included from HARDI.
8.
Section valves. Turns individual spray sections on or off. Lever up is OFF, and lever down is ON.
1
2
3
8
7
6
5
4
Содержание RANGER PRO VH
Страница 4: ...1 EU Declaration 4 ...
Страница 10: ...Table of Contents 6 ...
Страница 108: ...5 Operation 104 ...
Страница 111: ...6 Maintenance 107 Boom Lubrication Oiling Plan Lubrication Oiling Plan Trailer Paralift ...
Страница 142: ...6 Maintenance 138 ...
Страница 149: ...8 Technical Specifications 145 Pump Specifications Pump Model 364 5 5 Pump Model 364 7 0 Pump Model 364 10 0 ...
Страница 164: ...Index 160 ...
Страница 166: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...