43
4-2-1 Assemble and remove moving head (except for 1
st
head)
2-7. Install Thread tension bracket.
(Pan head screw : M4-10 4 pcs)
2-8. Set Front panel (Upper)
, cord clip and lighting bracket
.
(Truss head screw : M4-6 4 pcs)
Upper shaft cover
Cord clip
Lighting bracket
3. After installation of moving head, please check following
points;
3-1. Check needle height, please check needle height at 1
st
,
8
th
and 15
th
needle.
Please refer to [ 2-5 Check of needle height ].
In case needle height is not same for each needle,
installation of moving head was wrong,
Please check step 2-3 again.
3-2. Check of rotary hook timing, please check hook timing
by 8
th
needle.
Please refer to [ 2-6 Check of rotary hook timing ]
In case hook timing is not correct, installation of moving
head was wrong,
Please check step 2-5 again.
Содержание HCR3-1502
Страница 1: ... Maintenance Manual for Embroidery Machine HCR3E SERIES Version 1 2 HappyJapan Inc ...
Страница 104: ...105 4 7 3 Adjustment of timing detecting unit 8 Finally put the cover back on ...
Страница 107: ...107 ...
Страница 172: ...172 E7 Electric system diagram E7 1 Pulse motor driver PMD wiring ...
Страница 173: ...173 E7 2 Pulse motor driver PMD setup ...
Страница 174: ...174 E7 3 Inverter wiring ...
Страница 175: ...175 E7 4 Electrical connection diagram ...
Страница 176: ...176 ...
Страница 177: ...177 ...
Страница 178: ...178 E7 5 List of electrical connection diagram ...
Страница 179: ...179 ...
Страница 180: ...180 E7 6 Explanation of function clrcuit board HCD8122 LCD CE MX Board Ass y ...
Страница 181: ...181 HCD8116 TP SW Circuit Board Ass y CN No Function CN1 Switch output LED input ...
Страница 182: ...182 HCR8121 CONT R2 Circuit Board Ass y ...
Страница 216: ...2018 9 HappyJapan Inc 9 5 TAITO 2 CHOME TAITO KU TOKYO JAPAN TEL 81 3 3834 0711 FAX 81 3 3835 8917 ...