4
1.1 Checking Product
1.2 Safety Information
2.1 Installation place and caution notice
2.2 Installation method
2.3 Suffix code
2.4 Dimensions / Panel cutout and terminal arrangement
2.5 Terminal arrangement method
3.1 Initial screen
3.2 Basic input mehtod
3.3 Name of operation screen
3.4 Fixed control operation
3.5 Program control operation
3.6 Graph indication and setup
3.7 Errors and indicators for various events
4.1 Operation screen
4.2 Setup screen
5.1 Operation setup
5.2 Time/Timer setup
5.3 Program setup
6.1 Sensor input setup
6.2 Control/Transmission setup
6.3 Inner signal setup
6.4 Alarm setup
6.5 PID setup
6.6 Inputs at point of contect (DI) setup
6.7 Point of contact output (DO) setup
6.8 Communication setup
6.9 Other setup
7.1 Input sepcification
7.2 Output specification
7.3 Functions
7.4 Communication
7.5 Ratings
7.6 Operation environment
7.7 Condition of transport and storage
5
6
7
8
9
9
11
15
15
17
26
27
30
31
32
34
35
36
36
40
41
42
43
43
45
46
48
48
49
49
50
51
51
52
52
1 Before starting
2 Installation instruction
3 Setting and operation
4 Display
5 Function setting
6 System setting
7 Specification
CONTENTS
هﺮﮐ
ﮓﻧﺎﯿﻧﺎﻫ
تﻻﻮﺼﺤﻣ
یرﺎﺼﺤﻧا
هﺪﻨﯾﺎﻧﻤ
ناﻮﯿﺳ
ﺖﮐﴍ
021-33989001
www.sivancarno.com
021-33989002