HAMWORTHY HEATING LTD
WARMWELL
500001091/F
Figure 1.1 Boiler Installation (Typical)
Expansion pipe
Mains water
Float
valve
Feed &
expansion
tank
Drain
Safety
valve
Pressure &
Temperature
gauges
P
T
Valve
Automatic
Air Vent
Circulation pump
(System)
Heating load
Valve
Drain
valve
Circulation pump
(Primary loop)
Feed
pipe
Hamworthy Modular Boilers
1
2
3
Module Module Module
T
VENTED SYSTEM: Primary loop, Hamworthy recommended system.
Mains water
Automatic
Air Vent
Drain
Safety
valve
Pressure &
Temperature
gauges
Valve
Valve
Lockshield
valve
Automatic
Air Vent
Expansion
vessel
Lockshield
valve
Drain
valve
Lockshield
valve
Temporary
fill line
Double
check
valve
T
Module
1
Module
2
Module
3
Hamworthy Modular Boilers
P
T
Circulation pump
(System)
Heating load
Valve
Drain
valve
Circulation pump
(Primary loop)
UNVENTED SYSTEM: Primary loop, Hamworthy recommended system.
Expansion pipe
Float
valve
Valve
Mains water Feed &
expansion
tank
Feed
pipe
Circulation pump
(Primary loop)
Module
1
Module
2
Module
3
Hamworthy Modular Boilers
Drain
Safety
valve
P T
Pressure &
Temperature
Gauges
Valve
Circulation pump
(System)
Heating load
Automatic
Air Vent
VENTED SYSTEM: Single pipe header
Mains water
Lockshield
valve
Automatic
Air Vent
Expansion
vessel
Lockshield
valve
Lockshield
valve
Temporary
fill line
Drain
valve
Double
check
valve
Circulation pump
(Primary loop)
Hamworthy Modular Boilers
Module
1
Module
2
Module
3
Drain
Safety
valve
Pressure &
Temperature
gauges
P T
Valve
Circulation pump
(System)
Automatic
Air Vent
Heating load
Valve
Drain
valve
UNVENTED SYSTEM: Single pipe header
2
Содержание Warmwell 120
Страница 50: ...HAMWORTHY HEATING LTD WARMWELL 500001091 F NOTES 44...
Страница 51: ...Notes...