background image

 

HAMWORTHY HEATING LTD  

 

 

WARMWELL 

 

500001091/F 

2.0

 

TECHNICAL DATA 

 
2.1

 Overall dimensions are shown in Figure 2.1 (p3).  

Both single and multiple boiler arrangements are 
shown. 
 
The Warmwell boiler can be installed as a single 
unit or in modular form where a 'multi' casing 
reduces required floor area.  Each boiler has an 
independent door for access to the controls and 
other working components. 
 
It is recommended that a maximum of 6 boilers can 
be positioned on 533mm (21") centres if required.  
Larger numbers should be split into two or more 
banks with 150mm (6") between each bank.  

NOTE!

   

To install modular units on 533mm (21") centres, the 
casing support rail or spacing plates should be fitted 
between each boiler before bolting together.  See 

Section

 

10.1:

 

General Installation of Boilers 

(p16) 

Ref.: - spacing plates for further information.  See 
Figure 2.1 (p3) re: - coupling of Warmwell and 
Purewell boilers.  The boiler can also be installed in 
a 'stand alone configuration' if required. 

 
2.2

 General Information and Technical Data relating 

to Natural Gas is shown in Figure 2.2 (p4). 

 

Technical data relating to propane firing can be 
found in Appendix ‘A’ (p41). 
 

2.3 Screw threads

: All screw threads used in the 

Warmwell boiler conform to the following: - 

 
ISO 7/1

 or 

ISO 228/1

 for pipe threads where 

applicable.  

ISO 262

 for all general screw threads. 

 

3.0

 

GENERAL REQUIREMENTS 

 
3.1

 

Related Documents

 

 
Gas Safety Installations and Use Regulations 
1998, (As amended).  

It is law that competent 

persons in accordance with the above regulations 
install all gas appliances.  Failure to install 
appliances correctly could lead to prosecution.  It is 
in your own interest, and that of safety, to ensure 
that this law is complied with. 
 
The installation of the boiler 

MUST

 be in accordance 

with the relevant requirements of the Gas Safety 
Regulations, Building Regulations, IEE Regulations 
and the bylaws of the local water undertaking. 
 
The installation should also be in accordance with 
any relevant requirements of the local gas region 
and local authority and the relevant 
recommendations of the following documents: - 
 

British Standards 

 

 

BS 7074:

 Application, selection and installation of 

expansion vessels and ancillary equipment for 

sealed water systems. 

Part 2:

 Code of practice for 

low and medium temperature hot water systems. 

 
BS 6891:

 Installation of low pressure gas pipework 

of up to 28mm in domestic premises (for larger 
installations see 

IGE/UP/1

IGE/UP/1A

 and 

IGE/

UP/2

 
BS 6644:

 Installation of Gas Fired Hot Water 

Boilers - 60kW to 2MW. 

 
BS 6700:

 Design, installation, testing and 

maintenance of services supplying water for 
domestic use. 

 
BS 6880:

 

Part 1, 2 & 3:

 Code of practice for low 

temperature hot water heating systems of output 
greater than 45kW. 

 
BS EN 60335, Part 1. 

Safety of Household & similar 

electrical appliances.

 BS 3456, Part 201:

 Electrical 

Standards. 

 
CP 342:

 Centralised hot water supply.  Part 2: 

Buildings other than individual dwellings. 
 

I. Gas E. Publications

 

 
IGE/UP/1

  Soundness testing and purging of 

industrial and commercial gas installations. 

 
IGE/UP/1A

 Soundness testing and direct purging of 

small low pressure industrial and commercial natural 
gas installations. 

 
IGE/UP/2 

Gas installation pipework, boosters and 

compressors in industrial and commercial premises. 

 
IGE/UP/10

 Installation of gas appliances in industrial 

and commercial premises Pt 1 flued appliances. 
 

Health and Safety Executive: -

 

Guidance note PM5

 - Automatically controlled 

steam and hot water boilers. 

 
CIBSE Publications: -

   

"CIBSE Guide"

 

 
It is impractical in this document to specify all 
relevant information, but the following extracts from 
the above references are emphasised since failure 
to comply with these requirements will almost 
certainly result in an unsatisfactory installation. 
 

3.2

 

Feed Water Quality

 

 
If the boiler feed water has a high degree of 
hardness, it is recommended that the water be 
treated to prevent precipitation of scale or sludge in 
the boiler water passageways.  Details of additives 
can be obtained from any reliable manufacturer of 
water treatment products or the local water 
authority.

 

Содержание Warmwell 120

Страница 1: ...COMMISSIONING OPERATING OR SERVICING EQUIPMENT Warmwell Series Boilers Cast Iron Atmospheric Condensing Modular Boilers with Automatic Ignition for Heating and Domestic Hot Water Installations Install...

Страница 2: ...ating safely and efficiently Maintenance Agreements 01202 662555 Regular routine servicing of equipment by Hamworthy service engineers inspects the safety and integrity of the plant reducing the risk...

Страница 3: ...IS INTENDED FOR USE AS A COMMERCIAL APPLIANCE AND IS NOT CERTIFIED FOR USE IN DOMESTIC APPLICATIONS OR HABITABLE AREAS W80 AND W120 SUITABLE FOR USE ON GROUP H NATURAL GAS 2ND FAMILY I2H W60 W95 AND...

Страница 4: ...eral Requirements 6 2 Design Waste Gas Volume and Temperature 6 3 Flue Condensation 6 4 Materials 6 5 Disconnection 6 6 Flue Discharge 6 7 Surface Temperatures 6 8 Flue System Location 7 0 AIR SUPPLY...

Страница 5: ...Casing and Controls Assembly 11 0 COMMISSIONING AND TESTING 24 11 1 Electrical Installation 11 2 Gas Installation 11 3 Water Circulation System 11 4 Commissioning the Boiler 11 5 Boiler Checks Prior t...

Страница 6: ...t Exchanger Insulation Fitting Instructions 16 17 Figure 10 2 2 Secondary Heat Exchanger Insulation Fitting Instructions 17 Figure 10 3 Gas Pipe Fitting Instructions 18 Figure 10 6 Assembly of Seconda...

Страница 7: ...et and that the relevant interlocks will shut the boiler s off should a high or low pressure fault occur The Pressurisation unit must also incorporate a low level water switch which protects the water...

Страница 8: ...Hamworthy Modular Boilers P T Circulation pump System Heating load Valve Drain valve Circulation pump Primary loop UNVENTED SYSTEM Primary loop Hamworthy recommended system Expansion pipe Float valve...

Страница 9: ...Flue Outlet Dia mm 152 152 152 120 395 1060 957 1141 R1 761 152 Note For modular applications the top casing from the 60 80 and 95 models can only be fitted to Purewell 40 80kW range likewise the 120...

Страница 10: ...1 5 1 2 Gas Flow Rate High Fire m3 h 5 92 9 44 14 10 Injector Marking Dia mm 3 1 4 2 4 4 No Burner Bars Injectors 5 WATER DATA Water Connections Flow Rc2 Return Rc2 Maximum Water Pressure bar g 6 Wate...

Страница 11: ...ccordance with any relevant requirements of the local gas region and local authority and the relevant recommendations of the following documents British Standards BS 7074 Application selection and ins...

Страница 12: ...30 C to ensure condensing takes place thus achieving the correct output The boiler can also be used in the high efficiency mode with flow return temperatures of 80 60 C i e non condensing where it wi...

Страница 13: ...lity of an adequate supply of gas An existing service pipe must not be used without prior consultation with the local gas region 5 2 Meters A new gas meter will be connected to the service pipe by the...

Страница 14: ...as line shown below Figure 5 3 Gas Flow in Pipes Total Gas Input m hr NB 20mm 25mm 40mm 50mm 65mm 80mm 100mm 4 73 10 42 5 92 25 180 820 7 10 16 120 540 8 27 11 85 380 9 44 62 280 900 11 19 42 185 580...

Страница 15: ...an 2m 6ft away 4 The flue system should be designed to achieve a negative suction at all times on all modules in a bank For optimum performance draught conditions should be between 0 05 to 0 125mbar I...

Страница 16: ...nd pipework This must be avoided at all times Insulate condense pipes if freezing temperatures are likely to be encountered 6 5 Disconnection Provisions should be made for disconnection of the flue pi...

Страница 17: ...ction 8 8 Minimum Water Flow Rates p12 and Figure 2 2 p4 Recommendations for the water circulation system are given in BS 6644 and CP 342 The following notes are of particular importance 1 In a combin...

Страница 18: ...p4 NOTE If boilers are run off time clock control a pump overrun not HHL supply should be fitted which must run for a minimum of 5 minutes on shut down of the last boiler 8 10 Control Schemes 8 10 1...

Страница 19: ...ncorporates a 10way plug socket screw terminal block to make the site wiring connections Refer to Figure 8 12 p14 and the Milton boiler sequence control installation manual for wiring connection detai...

Страница 20: ...2 Site Wiring Diagram REMOTE CONTROL LOOP ON OFF NOTE TERMINAL 1 IS SUPPLIED WITH230VAC MAINS VOLTAGE BEFED ONTOTHESETERMINALS MUSTNOT TO HAMWORTHY HEATING LIMITED MILTON BOILER SEQUENCE CONTROL REFER...

Страница 21: ...ACTS RATED AT 250V AC 5A CN17 L E N 15 CN8 1 2 N E L CN13 15 17 16 20 19 18 17 16 19 18 20 CN18 CN19 21 31 33 32 230V AC 50Hz SUPPLY FROM A MAINS ISOLATOR WITH MINIMUM 3mm SEPARATION IN ALL POLES N L...

Страница 22: ...ding burners and gas valve s etc on a pallet 2 Casing complete with assembly instructions 3 Control panel assembly 4 Condensing section assembly fitted to item 2 Further details of each individual ass...

Страница 23: ...nspection door Reference to Figure 10 2 1b Insulation should be folded around boiler such that its rear edges meet in the centre Ensure flow and return connections are clear and unobstructed Apply foi...

Страница 24: ...ar from obstruction 10 5 Gas Connection The Warmwell boiler is supplied with a gas pipe which exits the casing at the rear after installation see Figure 2 1 p3 for position The incoming mains gas supp...

Страница 25: ...nt on boiler model Discard the unused item Fit U nuts item 15 to the holes at each end of the side panel support Fit 2off M6 nuts and plain washers items 9 and 36 to the M6 studs located on the top of...

Страница 26: ...HAMWORTHY HEATING LTD WARMWELL 500001091 F Figure 10 6 Assembly of Secondary Heat Exchanger onto Primary Heat Exchanger if Supplied Separately 20...

Страница 27: ...kit ensuring that the ball studs locate correctly in the matching latches fitted to the top return of the lower side panels 4 Adjust the height of the side panel support such that its top face fits j...

Страница 28: ...19 2 16 3 16 15 21 16 20 15 1 DETAIL A 11 12 8 7 24 23 25 26 4 27 6 9 10 15 31 33 16 15 9 36 15 30 16 37 FASTENERS REF DETAIL A 2 POSITIONS EACH IN LH RH PANELS FASTENERS REF DETAIL A 4 POSITIONS FAST...

Страница 29: ...12 17 Top panel 1 1 18 M6 x 16mm pozi drive pan head screw 6 19 Bottom support rail 1 20 Top support rail 1 21 Rear support rail 1 22 Front support rail 1 23 Door location pin 2 2 24 M4 x 20 pozi driv...

Страница 30: ...endix A p41 NOTE All propane boilers are fitted with a low gas pressure switch set at 20mbar Should the gas supply pressure fall below this level the boiler will not operate 11 0 COMMISSIONING AND TES...

Страница 31: ...BURNER MANIFOLD GAS VALVE S GAS COCK GAS PIPE GAS VALVE GLAND PLATE DROP DOWN FASCIA IGNITION SEQUENCE CONTROLLER MAIN PCB SITE WIRING TERMINAL PLUGS CONTROLS HOUSING TEMPERATURE LIMITER OVERHEAT THER...

Страница 32: ...HAMWORTHY HEATING LIMITED AND PROVING SWITCH FAN LOW FIRE DAMPER AND PROVING SWITCH LK5 LK4 HIGH FIRE DAMPER BOILER CONTROL PCB CN2 CN1 SERIAL NO PCB MFR DATE PCB MFR PART NO 563901 10 MAX 0 MIN OFFSE...

Страница 33: ...Page 31 1 Gas supply is connected but turned to the off position Any unions or fittings are correctly tightened test points are closed burners correctly positioned injectors are in place of correct si...

Страница 34: ...EW OF FAN PLENUM CHAMBER A B FAN HOUSING FLUE DISCHARGE DUCT FAN PLUG SOCKET ASSEMBLY 7 WAY AIR PRESSURE SENSING TUBE CONNECTOR TO PRESSURE SWITCHES IN CONTROL PANEL SEE BELOW LEFT HAND SIDE PANEL IMP...

Страница 35: ...to carry out this procedure with all the boilers firing The long term reliability of the ignition system may well be reduced unless this procedure is carried out correctly ADJUSTMENT PROCEDURE Refer...

Страница 36: ...g point Light the boiler Remove protective cap from the Hi Lo pressure regulator Turn the Hi Lo valve high fire pressure regulator outer nut clockwise until the pressure stops increasing Loosen Thrott...

Страница 37: ...sible corrective scenarios Pressure switches are fitted to monitor the correct operation of the induced draught fan fitted to the Warmwell It ensures sufficient air is pulled through the boiler to fac...

Страница 38: ...n Neons ISS LK13 HAMWORTHY HEATING LIMITED AND PROVING SWITCH FAN LOW FIRE DAMPER AND PROVING SWITCH LK5 LK4 HIGH FIRE DAMPER BOILER CONTROL PCB CN2 CN1 SERIAL NO PCB MFR DATE PCB MFR PART NO 563901 1...

Страница 39: ...ssure switches Remove the exhaust fan control panel from the top side panels control circuit is configured to establish a light dark check thereby ensuring the switch is open no air before starting th...

Страница 40: ...the Low Gas Press Switch LPG only the Condense Level Switch Is there a demand from the thermostat Is neon Ne7 illuminated on the main PCB Is remote control link 16 1 2 secure CN Replace ignition cont...

Страница 41: ...plug and wiring to main PCB Cn12 Check High Fire Air Pressure Switch electrical connections and sensing tubes Temperature control circuit faulty Boiler at high fire but cycles on off rapidly Yes Poor...

Страница 42: ...4 Temperature Limiter Limit Stat Renewal Part No 339011044 or 533901179 The temperature limiter renewal procedure follows secured by 4 screws This will give access to the transition duct cover Remove...

Страница 43: ...LTD WARMWELL 500001091 F Figure 14 1 Diagram of Hot Surface Igniter and Sensing Probe Assembly 37 6 0mm Viewing Port 72mm REF 79mm REF Flame Probe Electrode 533805014 Hot Surface Igniter Assembly 563...

Страница 44: ...yout that of the control thermostat with some minor differences These are as below Remove the push on spade connections from the temperature limiter body noting position of coloured cables Remove plas...

Страница 45: ...the inside of the door and check for correct operation at both High and Low fire See Figure 2 2 p4 for correct settings If necessary refer to Section 11 4 Commissioning the Boiler p24 for correct pro...

Страница 46: ...long leads 533901350 Potentiometer incl PCB harness 563901258 Ignition Sequence Controller 533901344 Hours Run Meter 563901273 Fan speed controller 563901296 Fan Assembly Complete 533901229 Pressure...

Страница 47: ...n installer s guide highlight the different values and procedures to be used when firing propane and should be used in conjunction with the Main Installer s Guide Figure 2 2 Performance and General Da...

Страница 48: ...e switch should operate at approximately 20mbar noted on the multi meter Turn OFF the gas supply and undo the pressure test point on the gas valve inlet and allow the gas pressure to fall The switch s...

Страница 49: ...HAMWORTHY HEATING LTD WARMWELL 500001091 F NOTES INSTALLER SITE ADDRESS BOILER TYPE BOILER SIZE S UNIT NO S SERIAL NO S FLUE DATE OF COMMISSIONING USEFUL USER INFORMATION 43...

Страница 50: ...HAMWORTHY HEATING LTD WARMWELL 500001091 F NOTES 44...

Страница 51: ...Notes...

Страница 52: ...y reserves the right to make changes and improvements which may necessitate alteration to the specification without prior notice Connect direct Direct Dial Telephone and Fax Numbers Direct Email Addre...

Отзывы: