HAMWORTHY HEATING LTD
MILBORNE 500 SERIES
500001130/A
1
1.0 Introduction
The Milborne 500 series is a range of wall hung
boilers comprising 1 or 2 50kW boiler modules
within a single casing. Having a comprehensive
built-in controls package the boiler is particularly
suited to installations that do not have a dedicated
controls installation.
Where larger installations require more power than
a single boiler can produce then multiple boilers
may be installed in a modular arrangement.
Supplied from the factory as fully assembled units,
the boilers are set up for either natural gas or for
LPG prior to delivery. Where required a modification
may be made on site to change from one gas to
another.
Installation
In order to ensure safety and correct operation, the
installation shall always take place in full compliance
with the applicable Law and with the instructions
provided by the Manufacturer, and will always be
carried out by professionally qualified technical
personnel only. The equipment shall be installed in
a suitable area, and connected to the heating
system in accordance with the applicable Law.
Regulations
The following British Standard Codes of Practice
and Regulations have relevant recommendations
regarding the installation of Milborne boilers.
CR331.3
Low pressure installation pipes.
BS.5449.1
Forced circulation hot water
systems
BS.5446
Installation of gas hot water
supplies for domestic purposes
BS.5440.1
Flues (for gas appliances of
rated input not exceeding 60kW)
BS.5440.2
Air supply (for gas appliances of
rated input not exceeding 60kW)
BS.6798
Boilers of rated input not
exceeding 60kW
BS.6644
Installation of Gas Fired Hot
Water Boilers 60kW – 2MW
BS.6700
Design, installation, testing and
maintenance of services
supplying water for domestic use
BS.6880.1,2
&
3 Code of practice for low
temperature hot water heating
systems of output greater than
45kW
BS.7074.1&2 Application,
selection
and
installation of expansion vessels
and ancilliary equipment for
sealed water systems. Code of
practice for low and medium
temperature hot water systems
I. Gas E. Publications
IGE/UP/1
Soundness testing and purging
of industrial and commercial gas installations
IGE/UP/1A
Soundness testing and direct
purging of small low pressure
industrial and commercial natural
gas installations
IGE/UP/2
Gas installation pipework,
boosters and compressors in
industrial and commercial
premises
IGE/UP/10
Installation of gas appliances in
industrial and commercial
premises Pt1 flued appliances
Health and safety executive
Guidance note PM5
Automatically controlled
steam and hot water boilers
Warranty
Full warranty assistance will be ensured when the
appliance is commissioned by Hamworthy Heating
Ltd commissioning engineers, please see Terms
and Conditions for full details.
The Manufacturer disclaims any and all
responsibility resulting from damage due to
tampering, improper use or mistakes made during
equipment installation, operation and maintenance.
In the event of failure or breakdown, isolate the
equipment and do not try to repair it. Call the
Technical Support Service tel 0845 450 2866.
Start-Up
The boiler shall be switched on for the first time by
approved Corgi registered engineers only. During
start-up, the engineer shall complete the
commissioning certificate and leave you a copy,
thus starting the warranty period, whose conditions
are specified in the Terms and Conditions available
on request.
Installation and User Manual
This manual shall be read carefully, in order to use
the boiler correctly and safely, and shall always be
kept safely.