11
4.2. Installation Procedure
1. Place the Power Supply Controller on a stable surface. The Power Supply Controller must be placed
within 2 meters of the Lamp House due to the length of the interconnecting cable. See drawing Section
10 for dimensional details.
2. Connect the Lamp House unit optical output to the user equipment using a suitable SMA fiber optic
cable.
The Lamp House should be mounted in the orientation shown in Figure 3, with the lamphouse
horizontal resting on its rubber feet. The lamp has been factory aligned in this position. Mounting the
lamp in a different orientation will cause the plasma position inside the bulb to shift slightly and may
cause performance variations.
See Section 10 for dimensional drawings of the Lamp House.
3. Connect the black 21-pin mixed D-sub interconnect cable from the Power Supply Controller to the
Lamp House. This cable must be connected before AC power is applied to the Power Supply
Controller.
4. Connect nitrogen purge gas to the Lamp House.
Clean and dry nitrogen from either a Dewar or research-grade N
2
bottle is recommended. Do not use
any other purge gas.
Grade 6 or better gas purity is recommended to maintain cleanliness of the optics,
and gas should be filtered to <5um. Supply pressure should be 20 psig (0.14 MPa). With a 20 psig inlet
pressure, the TLS-EQ-77H will consume approximately 0.4 slm of flow.
Be sure that the nitrogen source is connected to the upper fitting on the Lamp House. This fitting
contains a flow restrictor to limit gas flow to the necessary level.
5. Connect cooling fluid to the Lamp House.
Care must be taken when making connections to avoid damage to the fittings and tubing. Two
wrenches must always be used – one to hold the fitting body, and another to tighten the nut. See Figure
4.
To make the connection: first insert tubing into the fitting and tighten the nut finger tight. Then, tighten
the nut 1-1/4 turns from the finger-tight position, using two wrenches as shown.
Содержание ENERGETIQ LDTLS TLS-EQ-77H
Страница 3: ......