
Assembling and Installation Guide
29
8
Assembling and
Installation Guide
8.1
Mounting of 2830 and 2831
There is no special recommendation to install
the oil tester. A ideal position to mount the
2830/2831 is, to put the 2831 on the table and
the 2830 on top of the 2831 (see the picture
on the left side).
Check that the main switches are switched
off
8.2
Inter-wiring of 2830 and 2831
For the inter wiring of the 2830 and 2831 use only
the cable which are delivered with the instrument.
-
Connect the 2830 CX to the 2831 CX
-
Connect the 2830 CN to the 2831 CN
-
Connect the 2830 “V”(Common) to the 2831
“V”(Common)
-
Connect the 2830 “Earth” to the 2831 “Earth”
-
Connect the 2830 “LAN” to the 2831 “LAN”
-
Connect the 2830 “USB” to the 2831 “USB”
-
Connect the Interlock 1 and 2. The two
interlock plugs are part of scope of supply.
-
Connect the main power cable after
checking that the main switches are off.
Содержание 2830
Страница 1: ...2830 2831 Precision Liquid and Solid Dielectric Analyzer User Manual 4843477 M Version 3 0 ...
Страница 2: ...II Revision History Version Date Author Remarks 2 0 2013 12 MB 2nd release 3 0 2021 07 SM 3rd release ...
Страница 7: ...Introduction VII 17 Conformity 113 18 Notes 114 ...
Страница 8: ...VIII Introduction ...
Страница 121: ...Conformity 113 17 Conformity ...
Страница 122: ...114 Notes 18 Notes ...
Страница 123: ...Notes 115 ...