07
08
09
10
Glue the last section of railing
3
in place along the
port side of the decking
43-06
.
Feed the connector cable
43-09
through
43-01
(inset). Apply a little superglue to the tabs on the base
of
43-06
and fix into the recesses in deck
43-01
so
that wall
2
aligns with the front of the deck
43-01
.
Take the searchlight assembly from Stage 40 and feed
the cable through the hole in the admiral’s bridge deck
43-01
. Identify the tabs on the base of the superstructure
assembly (arrows), which fit into slots in the deck. Apply
a little superglue to the tabs and fix in place.
Tabs on the base of the signalman’s shelter
43-02
fit into slots at the aft of the admiral’s bridge deck
43-01
. Apply a little superglue to the tabs and fix
in place.
Glue the shelter
43-03
in place on top of the shelter
43-02
as shown.
Completed work
The admiral’s bridge, with lighting, is now assembled.
11
43-01
43-01
43-06
3
2
43-02
43-02
43-03
43-09
43-06
36
36
AGORA
MODELS
PB
AGORA
MODELS