01
. UPPER MAST DECK, CONNING TOWER AND AMMUNITION HOIST
STAGE 44
THE UPPER MAST DECK
01
02
44-02
44-03
44-09
44-01
44-04
44-07
1
2
3
4
44-05
44-08
44-06
1
3
2
4
3
44-01
44-03
44-05
44-01
44-03
44-04
44-06
1
3
2
4
3
COMPONENTS CHECKLIST
44-01:
Upper mast deck
44-02:
Accessories for the upper
mast deck
44-03:
Decking
44-04:
Lower section of the
conning tower (port)
44-05:
Lower section of the
conning tower (starboard)
44-06:
Ammunition hoist
44-07:
Port railing
44-08:
Starboard railing
44-09:
Two anchor rings
Place the upper mast deck
44-01
on your work
surface. Take the decking
44-03
and apply a little
superglue to the main contact points on the
underside.
Glue the decking
44-03
in place on the surface of the
upper mast deck
44-01
. Take the two sections of the
conning tower,
44-04
and
44-05
, check the fit and
apply a little superglue to the pegs at the fixing points
on part
44-05
.
37
37
AGORA
MODELS
PB
AGORA
MODELS