background image

Stephenson’s 

Rocket

Содержание Stephenson's Rocket

Страница 1: ...Stephenson s Rocket ...

Страница 2: ...E Bitte prüfen sie ob alle benötigten teile vorhanden sind UK Read all instructions and look at all diagrams FR Lire toutes les instructions et regarder toutes les figures ESP Leer las intrucciones y guardar a los diagrames IT Leggere tutte le istruzioni e guardare i diagrammi DE Lesen sie alle anweisungen und betrachten sie die schaubilder UK Check assembly before gluing FR Vérifier le montage av...

Страница 3: ...2 Or visit our website for tips advice and instructional videos All these can be found in Resources Advice Videos on our website ...

Страница 4: ...39 39 32 32 32 32 32 32 32 32 15 15 3mmx145mm 6mmx110mm 6mmx110mm 6mmx90mm 5mmx92mm 5mmx88mm 3mmx58mm x2 3mmx46mm x2 3mmx38 x2 2mmx34mm x4 3mmx 18mm 3mmx 12mm 3mmx10mm 64 64 5mmx 16mm 6mmx 16mm 5mmx20mm 5mmx32mm 62 6mmx35mm 49 49 10 3x16mm 3mmx10mm 9 x5 2 8 3mmx 12mm x2 x2 ...

Страница 5: ...4 51 x2 13 43 x2 45 x2 19 38 x2 ...

Страница 6: ...5 44 56 x2 18 x2 22 35 x2 36 x2 34 x4 59 31 31 46 x2 46 x2 23 x2 41 60 61 63 29 x2 17 17 21 58 ...

Страница 7: ...6 50 6 4 x2 5 3 1 47 x2 37 x2 57 ...

Страница 8: ...26 x2 25 x2 53 x2 11 7 27 x2 54 x2 42 33 33 16 14 20 x2 52 x2 12 40 x2 7 ...

Страница 9: ...m 3mmx12mm 3mmx12mm 4 5 3mm protruding If you are mounting this model on a Battery or Electric Drive Kit please refer to the Battery or Electric Drive Kit instructions before building the model as drive pulleys need to be fitted part way through the building process ...

Страница 10: ...9 1h 4 6 1i 7 1j 8 9 10 1g 1k 1l Line up hole with part 2 11 12 1m Boiler is rotated to fix 12 ...

Страница 11: ...10 2 13 13 Use part no 16 to help ensure side rails 15 are kept parallel 3 30mins 30mins 14 15 15 Ensure the Firebox 13 is parallel with the 3 x 15mm pegs on either side of rear boiler section 1 ...

Страница 12: ... still drying position and glue the frame built in section 3 Adjust the two parts 17 to fit against the inner rims of the frame The bottom of the two parts 17 must be level with the underside surface of the frame as the two front axle blocks 18 need to be glued in place at that point ...

Страница 13: ...12 5 20 20 19 6 6a 6b 6c 6d 6e 22 21 23 23 24 24 5mmx16mm 5mmx16mm 5mmx32mm 30mins 15mins ...

Страница 14: ...13 25 6mmx90mm 26 27 7 8 8a 8b 28 29 10mins 25 26 27 7a 7b ...

Страница 15: ...30 3mmx38mm 31 3mmx18mm 32 9 33 9 34 3mmx38mm 31 3mmx18mm 32 9 33 9 34 9a 9b 9c 9d 14 10mins 10mins Ensure the holes in 32 9 and 33 all line up with each other The curved side of part 34 is glued to part 33 ...

Страница 16: ...15 10 35 10a 36 37 10b 35 10c 36 37 10d 11a 11b 11c 38 11 2mmx34mm 2mmx34mm 10mins 10mins 34 Part 34 is glued with the flat surface against part 28 ...

Страница 17: ...c 12d 2mmx34mm 2mmx34mm 3mmx10mm 39 38 39 3mmx10mm 15mins 15mins It is very important that part 31 slides up and down the two 2 x 34mm rods very easily and does not stick at any point otherwise the pistons will not work 34 ...

Страница 18: ...17 13 13a 40 40 13b 13c 20mins You may want to sand the parts 40 to ensure good fit 41 ...

Страница 19: ...18 13d 14 14a Thread the axle through the first front axle block 18 and then through the hole in the drop arm 23 with no glue Drop Arm Assembly from stage 6 ...

Страница 20: ... that it is in alignment with the other part 29 on the other front wheel Make sure the shaft end is flush level with the outer surface of part 29 and does not protrude Turn the wheels carefully whilst the glue is still drying to check that they run evenly and do not oscillate Glue the friction disk in place by moving it to one side dabbing glue on shaft and then moving back Ensure it is central ...

Страница 21: ...20 15a 15 39 39 15b 15mins 15c 5mmx20mm 32 ...

Страница 22: ...21 16a 16 39 39 16b 15mins 16c 5mmx20mm 32 ...

Страница 23: ...7b 17c 44 43 3mmx10mm 3mmx10mm 3mmx10mm 3mmx10mm 3mmx10mm 3mmx10mm 45 17d 10mins When fitting the parts 43 and 44 into the sides 45 it helps to locate the pegs in the holes if you sand the end of the pegs to a point ...

Страница 24: ...45 17d 20mins 18 18a 30 6mmx110mm 6mmx16mm 6mmx110mm 6mmx35mm 46 46 30 18b 20mins 20mins 23 ...

Страница 25: ...7 47 19 19a 30 51 30 30 30 19b 19c 19d 24 46 46 When gluing on the cranks 46 to the shafts make sure the end of the shaft is flush level with the surface of the cranks 46 and that none of the shaft is protruding ...

Страница 26: ...ey are positioned at the angle illustrated above on opposite ends of the main drive shafts on either side of the main base unit 125o Slowly turn the 6mm x 35mm handle just to check that the crank assembly runs smoothly before the glue is completely dry If it doesn t adjust the angles slightly on the cranks 46 ...

Страница 27: ... either side of the part 48 and then push up the two parts 47 Make sure they are central as shown and that they do not oscillate when the handle is turned Repeat the above process with the front drive disc 50 making sure it is central and does not oscillate ...

Страница 28: ...21 27 21c 21d 21e 5mmx92mm 55 32 21a 53 54 52 21b 53 54 52 56 56 25mins 22 Line up the front inside edge of the Rear Drop Axle 56 with the back of the Firebox 13 as shown ...

Страница 29: ...23a When the wheel is in place glue part 57 centrally on the rear axle 23b 23c 32 55 Push the spacer 55 so that it is level with the end of the shaft 5x92 Carefully turn the wheels to check they do not oscillate ...

Страница 30: ...dle until all 4 wheels start to turn freely You will need to put glue halfway up the shaft and raise up the pivot block 22 until it is at an angle of about 30º to the base sides as shown This helps turn the wheels freely and is important While the glue is drying it is a good idea to lay the model on one end so the parts dry in the correct position and don t slide down ...

Страница 31: ...59 follow steps 26 and 26b Fit one side at a time If a piston sticks at the top or bottom of its travel either extend the length of the 3 x 46mm rod by pulling the parts 58 and 59 out by 2 3mm if it is hitting the bottom Piston Plate or cut off 2 3mm from the 3 x 46mm rod if it is hitting the top Piston Plate ...

Страница 32: ... use a drop at this stage overwise you may be holding the funnel for a long time 27a 27 31 60 62 61 Use part 62 in position to check face of part 61 is parallel to line of 62 when seen from above looking down the funnel 28 15mins 27b 27c ...

Страница 33: ...32 29 30 3mmx58mm 64 3mmx58mm 3mmx145mm 64 3mmx145mm 30a 30b ...

Страница 34: ...33 The holes in 62 are angled Spin the part around so that the 3mmx145mm will splay outwards towards the pistons at the back 31 32 ...

Страница 35: ...ibles directamente desde Timberkit Ltd o desde las nuestra tiendas en Reino Unido Europa o en otros continentes Visita el nuestro sitio web para conocer el punto vendida mas cercano IT Se ti sei entusiasmato a costruire questo modello perche non provare gli altri Sono disponibili direttamente dalla Timberkits Ltd oppure dai nostri rivenditori in Gran Bretagna Europa e altri continenti Visita il no...

Страница 36: ...erkits Limited Old Village Hall Llanbrynmair Powys SY19 7AA 00 44 0 1650 521635 timber_kits btconnect com www timberkits com Timberkits logo and all Timberkits designs are Copyright 2012 all rights reserved ...

Отзывы: