English
135
Exchange of the reagents
Normal operation of this instrument may involve the use of hazardous
chemicals or biologically harmful samples.
•
Observe all cautionary information printed on the original solution
containers and safety data sheet prior to their use.
•
Dispose of all consumed solutions in accordance with national
regulations and laws.
•
Select the type of protective equipment suitable to the concentration
and quantity of the dangerous material at the respective work place.
Required reagents
Figure 12 Exchange of the reagents
N O T I C E
For a long-term shutdown (over 2 days), the valve hoses must be removed
from the pinch valves to provide relief. But because of the return flow risk, the
hoses must first be removed from the respective screw caps (canister lids)!
D A N G E R
Potential danger in the event of contact with chemical/biological materials.
Handling chemical samples, standards and reagents can be dangerous.
Familiarize yourself with the necessary safety procedures and the correct
handling of the chemicals before the work and read and follow all relevant safety
data sheets.
Designation
Item no.
Volume
Supply for
Reagent A
BCF689 5.2 L
3 months
Reagent C
BCF691 5.2 L
3 months
Reagent D
BCF692 5.2 L
3 months
Additional component for
reagent A
BCZ822
250 mL
Additional component for
reagent D
BCZ824
100 mL
Standard solution
LCW 824
500 mL
6–12 months
Содержание PHOSPHAX sigma High Range
Страница 5: ...5 II 2 230 V AC 10 50 Hz 145 VA x 540 mm x 600 mm x 400 mm 22 kg...
Страница 7: ...7 12 2005 2002 96 Hach Lange Hach Lange...
Страница 8: ...8 2 SIGMATAX 2 PHOSPHAX sigma 50 kg 1785 1830 352 1200 527 527 300 0 5 C 40 C 420 1200 200 150 420...
Страница 9: ...9 1 SERVICE 2 3 5 6 3 4 4 3 CEE 10 A STO P 1 2 3 4 5 6 7 5 6...
Страница 10: ...10 4 1 2 m SIGMATAX 2 PG LZP 573 5 2 m 5 PG 6 9 mm 1 4 m T 2 5 A L 250 V...
Страница 11: ...11 6 SIGMATAX 2 SIGMATAX 2 1 2...
Страница 13: ...13 48 18 SERVICE PRE PUMPING 28 1 SERVICE 2 A C D 3 4 PRE PUMPING 5 6 PRE PUMPING 7 3 6 A C D 2...
Страница 15: ...15 15 PHOSPHAX sigma 1 2 m 5 100 C SERVICE C D 9 48...
Страница 16: ...16 3 A C D 6 6 1 2 a SERVICE 18 SERVICE 3 6 Hach Lange 10 30...
Страница 17: ...17 Q1 Q2 QA A A PHOSPHAX sigma 11 10 C 5 6 48 6 7 PHOSPHAX...
Страница 26: ...26 2 A BCF689 5 2 L 3 C BCF691 5 2 L 3 D BCF692 5 2 L 3 A BCZ822 250 mL D BCZ824 100 mL LCW 824 500 mL 6 12...
Страница 27: ...27 12 A D A D 5 3 1 2 D D 3 A D 2 x 1 4 A D 5 3 SERVICE 6 7 8 PRE PUMPING 6 12 1 2 3 4 SETTINGS STANDARD...
Страница 29: ...29 PHOSPHAX sigma 12 6 O A C D 3 3 18 24...
Страница 32: ...32...
Страница 114: ...Deutsch 114...
Страница 226: ...Fran ais 226...
Страница 282: ...Italiano 282...
Страница 370: ...Rom n 370...
Страница 452: ...T rk e 452...
Страница 456: ...456 2005 8 12 2002 96 EC Hach Lange Hach Lange...
Страница 463: ...463 100 C SERVICE C D 9 3 A C D 6 6 1 2 48 Pump cassette Pump roller...
Страница 464: ...464 SERVICE 466 SERVICE 3 6 Hach Lange 10 Q1 Q2 QA A A PHOSPHAX sigma 30 48...
Страница 465: ...465 11 STATUS 10 C 5 6 6 7 PHOSPHAX...
Страница 473: ...473 12 2 A BCF689 5 2 L 3 C BCF691 5 2 L 3 D BCF692 5 2 L 3 A BCZ822 250 mL D BCZ824 100 mL LCW824 500 mL 6 12...
Страница 476: ...476 PHOSPHAX sigma 12 6 O A C D 3 3 18 24...
Страница 477: ...477 Status STATUS SIGMATAX SIGMATAX STATUS SIGMATAX SIGMATAX SIGMATAX STATUS...
Страница 479: ...480...