English
123
7.
Check that the connection cable runs loosely through the device
and then tighten the cable screw connection firmly again.
8.
The limit-value contacts must be used variably as normally closed
contacts or normally open contacts (each with three connection
terminals with switch symbol).
9.
All externally connected lines must be shielded, all shields are
screwed to the terminal block near to the hinge!
Startup
After the installation of the device, the reagents are placed in the
refrigerator.
Refer to
section Exchange of the reagents
.
Upon full hose connection including drain hose, the power plug can be
plugged in both for the refrigerator and for the measurement device.
This begins the measurement operation immediately. All device settings
are described in the software menu system.
Passcode Protection
To protect the device from unauthorized access or unwanted operation,
a password function can be activated directly at commissioning or later
at any time via a laptop by the HACH-LANGE employee. The passcode
is four digits and each of these consists of the numbers 1–4, which can
be freely programmed.
Shutdown
Note:
Please observe during the handling of the reagents the safety
notes under
section Exchange of the reagents
So that no crystallization or other major impurities impede a subsequent
commissioning, the entire system must be purged for a shutdown of
more than 48 hours with distilled water (
Purge process
1.
Call up [+SERVICE] menu
2.
Unscrew screw caps from the reagent canisters A, C and D
complete with the suction pipes (please unscrew ORIGINAL CAP)
and place in a beaker with distilled water
3.
Pull out the hose from the standard solution, remove screw cap,
unscrew ORIGINAL CAP, remove bottle
4.
Select menu item [PRE PUMPING]
5.
After the rinse process, take the suction pipes out of the beaker
again
6.
Select menu item [PRE PUMPING] again
7.
To finish, release pump cassettes and remove the hoses from the
three hose pinch valves
Analysis part
Dosing hoses are hoses that are routed via the sample- and reagent
pumps. Each dosing hose may only be used on the corresponding
sample- or reagent pump.
Note:
After 3 months, replace the sample dosing hose, the drain hose
and the hose for the standard. Coat the pump rollers of the sample pump
with silicone paste.
After 6 months, replace the dosing hoses for the reagents A, C and D.
N O T I C E
For a long-term shutdown (over 2 days), the valve hoses must be removed from
the pinch valves to provide relief. But because of the return flow risk, the hoses
must first be removed from the respective screw caps (canister lids)! Please
observe during the handling of the reagents the safety notes under
.
N O T I C E
For all work on the dosing- and valve hoses, always remove the dosing hoses
from the respective canisters first. (Return flow hazard). Please observe during
the handling of the reagents the safety notes under
Содержание PHOSPHAX sigma High Range
Страница 5: ...5 II 2 230 V AC 10 50 Hz 145 VA x 540 mm x 600 mm x 400 mm 22 kg...
Страница 7: ...7 12 2005 2002 96 Hach Lange Hach Lange...
Страница 8: ...8 2 SIGMATAX 2 PHOSPHAX sigma 50 kg 1785 1830 352 1200 527 527 300 0 5 C 40 C 420 1200 200 150 420...
Страница 9: ...9 1 SERVICE 2 3 5 6 3 4 4 3 CEE 10 A STO P 1 2 3 4 5 6 7 5 6...
Страница 10: ...10 4 1 2 m SIGMATAX 2 PG LZP 573 5 2 m 5 PG 6 9 mm 1 4 m T 2 5 A L 250 V...
Страница 11: ...11 6 SIGMATAX 2 SIGMATAX 2 1 2...
Страница 13: ...13 48 18 SERVICE PRE PUMPING 28 1 SERVICE 2 A C D 3 4 PRE PUMPING 5 6 PRE PUMPING 7 3 6 A C D 2...
Страница 15: ...15 15 PHOSPHAX sigma 1 2 m 5 100 C SERVICE C D 9 48...
Страница 16: ...16 3 A C D 6 6 1 2 a SERVICE 18 SERVICE 3 6 Hach Lange 10 30...
Страница 17: ...17 Q1 Q2 QA A A PHOSPHAX sigma 11 10 C 5 6 48 6 7 PHOSPHAX...
Страница 26: ...26 2 A BCF689 5 2 L 3 C BCF691 5 2 L 3 D BCF692 5 2 L 3 A BCZ822 250 mL D BCZ824 100 mL LCW 824 500 mL 6 12...
Страница 27: ...27 12 A D A D 5 3 1 2 D D 3 A D 2 x 1 4 A D 5 3 SERVICE 6 7 8 PRE PUMPING 6 12 1 2 3 4 SETTINGS STANDARD...
Страница 29: ...29 PHOSPHAX sigma 12 6 O A C D 3 3 18 24...
Страница 32: ...32...
Страница 114: ...Deutsch 114...
Страница 226: ...Fran ais 226...
Страница 282: ...Italiano 282...
Страница 370: ...Rom n 370...
Страница 452: ...T rk e 452...
Страница 456: ...456 2005 8 12 2002 96 EC Hach Lange Hach Lange...
Страница 463: ...463 100 C SERVICE C D 9 3 A C D 6 6 1 2 48 Pump cassette Pump roller...
Страница 464: ...464 SERVICE 466 SERVICE 3 6 Hach Lange 10 Q1 Q2 QA A A PHOSPHAX sigma 30 48...
Страница 465: ...465 11 STATUS 10 C 5 6 6 7 PHOSPHAX...
Страница 473: ...473 12 2 A BCF689 5 2 L 3 C BCF691 5 2 L 3 D BCF692 5 2 L 3 A BCZ822 250 mL D BCZ824 100 mL LCW824 500 mL 6 12...
Страница 476: ...476 PHOSPHAX sigma 12 6 O A C D 3 3 18 24...
Страница 477: ...477 Status STATUS SIGMATAX SIGMATAX STATUS SIGMATAX SIGMATAX SIGMATAX STATUS...
Страница 479: ...480...