English
122
Figure 6 Routing of optical-fiber cable SIGMATAX 2 and signal lines
Terminal assignment — for current outputs and
limit-value contacts
Figure 7 View of the terminal board
In order to connect the transmission lines for current
output, limit-value contacts and bus interface, the following
work steps are required:
1.
Disconnect device from the mains supply.
2.
Open device door.
3.
Loosen the knurled screw at the top right and swivel the front panel
out forwards. The connections are located on the right on the
terminal board.
4.
Loosen the PG screw connection for the corresponding connection
cable and remove the blanking disc.
5.
Plug the cable through the screw connection into the device and
route forwards to the connection terminals.
6.
Plug cable ends into the corresponding connection terminals (wire
thickness maximum 1.5 mm
2
). The assignment of the connection
terminals is seen from
the view of the terminal board.
N O T I C E
Only shielded lines may be connected!
Optical-fiber cable from
SIGMATAX 2
Loosen
knurled screw
Front panel
Current output 1
Current output 2
Limit-value contacts
Interface
Power plug
Socket with
ground contact
A
B A B
1 1 2 2
1
2
3
4
5
6
7
8
9
10
11
12 13 14
RS 485
32 23 32 23
Relay 1 Relay 2 Current 1 Current2
Current I = current output 1 (submenu (+SPECIAL P) or (+CURRENT 1))
Current II = current output 2 (submenu (+SPECIAL OP) or (+CURRENT 2))
Terminals for
shielding
Terminal board
Relay I = relay-min (lower limit-value contact)
Relay II = relay-max (upper limit-value contact)
(Figure shows relays in idle state.)
Interface:
bus-capable
Содержание PHOSPHAX sigma High Range
Страница 5: ...5 II 2 230 V AC 10 50 Hz 145 VA x 540 mm x 600 mm x 400 mm 22 kg...
Страница 7: ...7 12 2005 2002 96 Hach Lange Hach Lange...
Страница 8: ...8 2 SIGMATAX 2 PHOSPHAX sigma 50 kg 1785 1830 352 1200 527 527 300 0 5 C 40 C 420 1200 200 150 420...
Страница 9: ...9 1 SERVICE 2 3 5 6 3 4 4 3 CEE 10 A STO P 1 2 3 4 5 6 7 5 6...
Страница 10: ...10 4 1 2 m SIGMATAX 2 PG LZP 573 5 2 m 5 PG 6 9 mm 1 4 m T 2 5 A L 250 V...
Страница 11: ...11 6 SIGMATAX 2 SIGMATAX 2 1 2...
Страница 13: ...13 48 18 SERVICE PRE PUMPING 28 1 SERVICE 2 A C D 3 4 PRE PUMPING 5 6 PRE PUMPING 7 3 6 A C D 2...
Страница 15: ...15 15 PHOSPHAX sigma 1 2 m 5 100 C SERVICE C D 9 48...
Страница 16: ...16 3 A C D 6 6 1 2 a SERVICE 18 SERVICE 3 6 Hach Lange 10 30...
Страница 17: ...17 Q1 Q2 QA A A PHOSPHAX sigma 11 10 C 5 6 48 6 7 PHOSPHAX...
Страница 26: ...26 2 A BCF689 5 2 L 3 C BCF691 5 2 L 3 D BCF692 5 2 L 3 A BCZ822 250 mL D BCZ824 100 mL LCW 824 500 mL 6 12...
Страница 27: ...27 12 A D A D 5 3 1 2 D D 3 A D 2 x 1 4 A D 5 3 SERVICE 6 7 8 PRE PUMPING 6 12 1 2 3 4 SETTINGS STANDARD...
Страница 29: ...29 PHOSPHAX sigma 12 6 O A C D 3 3 18 24...
Страница 32: ...32...
Страница 114: ...Deutsch 114...
Страница 226: ...Fran ais 226...
Страница 282: ...Italiano 282...
Страница 370: ...Rom n 370...
Страница 452: ...T rk e 452...
Страница 456: ...456 2005 8 12 2002 96 EC Hach Lange Hach Lange...
Страница 463: ...463 100 C SERVICE C D 9 3 A C D 6 6 1 2 48 Pump cassette Pump roller...
Страница 464: ...464 SERVICE 466 SERVICE 3 6 Hach Lange 10 Q1 Q2 QA A A PHOSPHAX sigma 30 48...
Страница 465: ...465 11 STATUS 10 C 5 6 6 7 PHOSPHAX...
Страница 473: ...473 12 2 A BCF689 5 2 L 3 C BCF691 5 2 L 3 D BCF692 5 2 L 3 A BCZ822 250 mL D BCZ824 100 mL LCW824 500 mL 6 12...
Страница 476: ...476 PHOSPHAX sigma 12 6 O A C D 3 3 18 24...
Страница 477: ...477 Status STATUS SIGMATAX SIGMATAX STATUS SIGMATAX SIGMATAX SIGMATAX STATUS...
Страница 479: ...480...