4-3
Figure 4-4
Define port parameters
Powering Up the V100-E
Checking before power-up
Check the following issues before powering up the V100-E:
z
Both the power cord and the PGND cable are correctly connected.
z
The voltage of the power supply matches the requirements.
z
The console cable is correctly connected. The console terminal (or PC) has been started and the
associated parameters have been set on it.
Before powering on the V100-E, locate the power switch so that you can disconnect the power supply in
time in case of an emergency.
Powering up the V100-E
z
Turn on the site power.
z
Turn on the power switch of the V100-E.
Checking after power-up
After the V100-E is powered up, please check: