3-9
Figure 3-12
Connect the PGND cable to the grounding hole of switch
(1) Rear panel of the switch
(2) Grounding sign
(3) Grounding hole
(4) OT terminal
(5) PGND cable
(6) Grounding screw
To attach the other end of the PGND cable to the grounding strip in the equipment room, follow these
steps:
Step1
Cut the PGND cable to a proper length according to the distance between the switch and the grounding
strip.
Step2
Peel 5 mm (0.20 in.) of insulation sheath using a wire stripper, and then insert the naked metal part
through the black insulation covering into the end of the OT terminal. (Two OT terminals are provided
with the PGND cable when shipped with the switch; select a proper OT terminal according to the size of
the grounding post.)
Step3
Secure the metal part of the cable to the OT terminal with a crimper, and then cover it with the insulation
covering. Then heat the insulation covering with a blowing machine to let it completely cover the metal
part.
Step4
Connect the OT terminal to the grounding pole of the grounding strip, and then fasten it with a hex nut.
Figure 3-13
Connect the ground wire to the grounding strip
(1) Grounding post
(2) Grounding strip
(3) PGND cable
(4) Hex nut