2-1
2
Preparing for installation
Determining the installation personnel
The personnel for installing and maintaining the router must have received professional training and
are familiar with the precautions in installation and skilled and professional in router installation and
maintenance.
Installation site requirements
Equipment room requirements
For correct operation of the router, make sure the equipment room meets the following
requirements:
The installation site has a good ventilation and cooling system.
•
The air inlet and outlet vents of the chassis are not blocked, clear of obstructions.
•
The air inlets vents of the chassis are away from the outlet vents of other devices.
•
The ambient temperature for the router is maintained in the range of 0°C to 45°C (32°F to
113°F).
•
The ambient humidity for the router is maintained in the range of 5% RH to 95 % RH,
non-condensing.
•
The equipment room is clean, dust-free, and can adequately keep the router from any form of
potential water damage.
Grounding requirements
Correctly grounding the router is crucial to lightning protection, anti-interference, and ESD
prevention. Use a good grounding system for the router. Make sure the resistance between the
chassis and the ground is less than 1 ohm.
Space requirements
IMPORTANT:
•
For the chassis to be accessible from front and rear, use a rack that has both a front door
(single-leaf door as a best practice) and rear door.
•
For easy installation and maintenance, reserve a minimum clearance of 1200 mm (47.24 in)
between the rack and walls or other devices.
Содержание CR19000-16
Страница 16: ...4 3 Figure 4 3 Mounting the router in a rack...
Страница 25: ...6 8 Figure 6 6 Connecting an AC power cord using a releasable cable tie...
Страница 36: ...9 3 Figure 9 3 Installing a filler panel in a fabric module slot...
Страница 38: ...10 2 Figure 10 1 Installing a fan tray...
Страница 43: ...11 5 Figure 11 6 Routing signal cables...