7.4
Setup, fastening
7.4.1
General
The following describes the steps for setting up and fastening the product.
WARNING
Heavy components
Components can be very heavy. Improper handling can cause severe or fatal
injuries!
• Use appropriate lifting units
• Use suitable means to secure the components against tipping over
• Only remove the safety devices after the product has been completely as-
sembled
Prerequisites
Before you set up the product at the installation site, the requirements as per
chapter
Tightening torques
Unless otherwise indicated, adhere to the tightening torques of Güdel.
7.4.2
Prerequisites
Base
The base must comply with the requirements of the intended application. For
information on the load per unit area and the surface properties, please refer
to the layout or the documentation for the complete system. The assessment
of the load capacity of the floor (concrete, reinforcement, payload, etc.) must
be carried out by a structural engineer or architect. Güdel is not responsible
for the load propagation within the foundation.
Lifting units
Lifting units are required for setting up and installing the product. Make sure
that appropriately dimensioned devices (crane, etc.) are available.
Lines
The supply lines have to meet the requirements of the application. For infor-
mation on the required capacities, please consult the documentation for the
complete system.
Commissioning
OPERATING MANUAL ZP 3-5 V4
72057594174110603_v5.0_
EN-US
50
Содержание ZP 3-5 V4
Страница 16: ...Table of contents OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 16...
Страница 46: ...Transport OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 46...
Страница 140: ...Commissioning OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 140...
Страница 142: ...Operation OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 142...
Страница 224: ...9 4 Maintenance schedules Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 224...
Страница 226: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 226...
Страница 228: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 228...
Страница 230: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 230...
Страница 234: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 234...
Страница 236: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 236...
Страница 238: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 238...
Страница 240: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 240...
Страница 242: ...Maintenance OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 242...
Страница 274: ...Repairs OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 274...
Страница 280: ...Decommissioning storage OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 280...
Страница 285: ...13 Spare parts supply Spare parts supply OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 285...
Страница 286: ...Spare parts supply OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 286...
Страница 292: ...Spare parts supply OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 292...
Страница 306: ...Illustrations OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 306...
Страница 310: ...List of tables OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 310...
Страница 318: ...Index OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US 318...
Страница 320: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 321: ...Hazard analysis Risk analysis Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 322: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 326: ...Addition to declaration of incorporation Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 327: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 330: ...Technical data Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 331: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 332: ...Layout Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 333: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 334: ...Spare parts lists Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 335: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 336: ...Options Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 337: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 338: ...Third party documentation Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 339: ...Appendix OPERATING MANUAL ZP 3 5 V4 72057594174110603_v5 0_EN US...
Страница 354: ...G DEL AG Industrie Nord CH 4900 Langenthal Switzerland Phone 41 62 916 91 91 info ch gudel com www gudel com...